My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />A. At a minimum, the following procedures shall be followed when joining PVC <br />pipe: <br />1. Cut pipe square to center line. <br />2. Clean inside of pipe and pitting to remove burrs, dust, dirt, debris, chips <br />and moisture. <br />3. Clean and dry the outside area of pipe that is to be glued. <br />4. Apply a coating of primer as recommended by the pipe manufacturer to <br />the entire interior surface of the fitting socket and to an equivalent area on <br />the exterior area on the exterior of the pipe and prior to applying solvent <br />cement. <br />5. The piping shall not be exposed to water for 24 hours after the last solvent <br />weld joint is made. <br />3.05 HDPE PIPE INSTALLATION <br />A. HDPE piping shall be joined by butt fusion and in conformance with the <br />manufacturer's recommendations. Laterals shall be joined to the header pipe by <br />fusion welding saddles or tees. Electrofusion couplings may also be used. <br />B. Fusion welding of HDPE pipe shall be performed by a certified operator. The <br />pipe Contractor shall certify operator. No pipe shall be installed prior to submittal <br />of the verification. <br />C. Pipes 2 inches and larger shall be welded with full penetration butt welds. <br />D. Electro -fusion couplings may be used where butt welding is not practical. <br />3.06 TESTING AND INSPECTION <br />A. The Contractor shall pressure test all pipes pursuant to section 01412 "Testing and <br />Inspection." <br />B. The Contractor shall provide testing, inspection, retests, and repairs. <br />North County LFG Collection System <br />San Joaquin County Public Works <br />5 <br />PIPING <br />Section 15055 <br />
The URL can be used to link to this page
Your browser does not support the video tag.