Laserfiche WebLink
D. Concrete forms shall be inspected by County Building Department prior to <br />pour. Request inspection two days prior to intended pour. Do not pour <br />until County has accepted forms and rebar as acceptable. <br />MEASUREMENT <br />A. Concrete Pads: Payment for Concrete Pads shall be in the basis of unit <br />price per cubic yard of installed concrete as identified in the Proposal. <br />Price for the completed works includes all labor, materials, equipment <br />necessary for grading, footings and_ foundation excavations, form works, <br />reinforcing, concrete, curing, anchor bolts, leveling bolts, dry pack, etc. as <br />shown on the drawing and as specified herein. Payment shall be full <br />compensation for labor, materials, tools, equipment, overhead, and other <br />work and incidentals necessary to complete the work of this section. <br />Unless authorized by the Owner, the quantity paid shall not exceed the <br />amount shown on the proposal for Concrete Pads. <br />B. Separate payment will not be made for work or materials specified in this <br />Section other than the concrete pads. Full compensation shall be <br />considered as included in the prices paid for the various contract items of <br />work involving concrete, and no additional compensation will be allowed <br />or paid. <br />END OF SECTION <br />0 <br />1 <br />North County LFG Collection System 5 CONCRETE <br />San Joaquin County Public Works Section 03302 <br />4.01 MEASUREMENT <br />A. Concrete Pads: Measurement for payment for the construction of the <br />concrete pads shall be based on the price for volume of concrete installed <br />in cubic yards. <br />B. Separate measurement for payment will not be made for other concrete <br />work or materials specified in this Section. <br />4.02 PAYMENT <br />A. Concrete Pads: Payment for Concrete Pads shall be in the basis of unit <br />price per cubic yard of installed concrete as identified in the Proposal. <br />Price for the completed works includes all labor, materials, equipment <br />necessary for grading, footings and_ foundation excavations, form works, <br />reinforcing, concrete, curing, anchor bolts, leveling bolts, dry pack, etc. as <br />shown on the drawing and as specified herein. Payment shall be full <br />compensation for labor, materials, tools, equipment, overhead, and other <br />work and incidentals necessary to complete the work of this section. <br />Unless authorized by the Owner, the quantity paid shall not exceed the <br />amount shown on the proposal for Concrete Pads. <br />B. Separate payment will not be made for work or materials specified in this <br />Section other than the concrete pads. Full compensation shall be <br />considered as included in the prices paid for the various contract items of <br />work involving concrete, and no additional compensation will be allowed <br />or paid. <br />END OF SECTION <br />0 <br />1 <br />North County LFG Collection System 5 CONCRETE <br />San Joaquin County Public Works Section 03302 <br />