My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:35 PM
Creation date
7/3/2020 11:02:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*or the current fill module. <br />The vehicle wash down area is located outside on the south side of the <br />maintenance building. The truck wash water drains toward the sump (a holding <br />tank) which is equipped with a grease trap. The grease trap is cleaned, and <br />the wash water is pumped out and used for the landfill watering when the sump <br />is 3/4 full. <br />The landfill module areas have a separate storm drainage system. For the fill <br />module, all four of its sides slopes drain toward a fill module drainage <br />basin. The drainage basin collects the runoff from the fill site. <br />An underground storm drain system, trenches, and channels is used to control <br />storm water from the recycling center and maintenance building. (See figure <br />B). The runoffs from the buildings are channeled or pumped to one of the three <br />10ite drainage basins which are designed for 100 -year storm. <br />2.2 LOADING/UNLOADING AREAS <br />The majority of loading and unloading refuse activities take place in the <br />recycling center. The center separates biodegradable from the non - <br />biodegradable wastes. The collected biodegradable waste are taken to the fill <br />site, and the non -biodegradable waste are collected for recycling to the <br />extent possible. <br />Both outside and inside areas of the recycling center are washed down <br />regularly for dust control. To control the wash water runoff, the grounds are <br />sloped toward sumps which are located on the north and south sides of the <br />center. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.