Laserfiche WebLink
*or the current fill module. <br />The vehicle wash down area is located outside on the south side of the <br />maintenance building. The truck wash water drains toward the sump (a holding <br />tank) which is equipped with a grease trap. The grease trap is cleaned, and <br />the wash water is pumped out and used for the landfill watering when the sump <br />is 3/4 full. <br />The landfill module areas have a separate storm drainage system. For the fill <br />module, all four of its sides slopes drain toward a fill module drainage <br />basin. The drainage basin collects the runoff from the fill site. <br />An underground storm drain system, trenches, and channels is used to control <br />storm water from the recycling center and maintenance building. (See figure <br />B). The runoffs from the buildings are channeled or pumped to one of the three <br />10ite drainage basins which are designed for 100 -year storm. <br />2.2 LOADING/UNLOADING AREAS <br />The majority of loading and unloading refuse activities take place in the <br />recycling center. The center separates biodegradable from the non - <br />biodegradable wastes. The collected biodegradable waste are taken to the fill <br />site, and the non -biodegradable waste are collected for recycling to the <br />extent possible. <br />Both outside and inside areas of the recycling center are washed down <br />regularly for dust control. To control the wash water runoff, the grounds are <br />sloped toward sumps which are located on the north and south sides of the <br />center. <br />4 <br />