Laserfiche WebLink
File No. 20-1008-36 <br /> July 14, 1995 <br /> a) The sampling procedures <br /> b) The frequency of sampling <br /> c) The pattern of sampling <br /> d) The material to be sampled <br /> e) The transportation and handling of samples <br /> f) The sampling documentation <br /> g) The sample reporting <br /> 4. With respect to laboratory testing, set forth: <br /> a) The laboratory test procedure <br /> b) The laboratory test documentation <br /> c) The laboratory test reporting <br /> 5. With respect to field testing, set forth: <br /> a) The field test procedure <br /> b) The pattern of field testing <br /> c) The frequency of field testing <br /> d) The documentation of field testing <br /> e) The reporting of field tests <br /> 6. Set forth the required contractor briefings <br /> 7. Establish responsibility for survey control of the work <br /> 8. Set forth the forms and other documentation required and the method of <br /> keeping, maintaining, and distributing records so that successful progress <br /> of the project can be demonstrated <br /> GSM.and CH/95 Page 2 of 31 July 14, 1995 <br /> 20-1008-36(CQACOR) Copyright 1995,Kleinfelder,Inc. <br />