File No. 20-1008-36 <br /> July 14, 1995 <br /> 2.7 ENGINEERING <br /> The SJDPW is the project manager and engineer for the project. It will provide engineering <br /> design plans and bench marks for the foundation and vegetative layers. Grade stakes will be <br /> provided by the earthwork contractor. The SJDPW will make modifications, as needed, to these <br /> design plans during construction and provide as-built grading plans of the completed final cover. <br /> Kleinfelder has completed a mix design for the borrow soil to be used for the barrier layer. <br /> Kleinfelder, as CQA Monitor, may modify the mix design during construction should there be a <br /> change in the quality of import clay, equipment operations, or other factors. <br /> Kleinfelder will compile all the CQA testing data for the project in the final CQA report, certify <br /> construction of the barrier layer, and compile a site map to scale showing the location and results <br /> of all CQA testing. The map can be correlated to the as-built drawings produced by the SJDPW. <br /> Any changes to engineering during the project will be approved by the County Project Engineer <br /> and coordinated with the CQA Officer. <br /> 2.8 FIELD OBSERVATIONS <br /> Part time field observation of construction of the entire final cover will be provided by SJDPW <br /> field engineers. <br /> Kleinfelder will provide limited construction observation of the foundation and vegetative layers <br /> and full-time observation of construction of the barrier layer. <br /> The SJDPW will keep daily logs and provide summary reports to Kleinfelder for the duration of <br /> the project and coordinate field observation scheduling with Kleinfelder. <br /> GSM.-md CH/95 Page 10 of 31 July 14, 1995 <br /> 20-1008-36(CQACOR) Copyright 1995,Kleinfelder,Inc. <br />