My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:24:32 AM
Creation date
7/3/2020 11:04:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1996.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-1008-36 <br /> July 14, 1995 <br /> 2.7 ENGINEERING <br /> The SJDPW is the project manager and engineer for the project. It will provide engineering <br /> design plans and bench marks for the foundation and vegetative layers. Grade stakes will be <br /> provided by the earthwork contractor. The SJDPW will make modifications, as needed, to these <br /> design plans during construction and provide as-built grading plans of the completed final cover. <br /> Kleinfelder has completed a mix design for the borrow soil to be used for the barrier layer. <br /> Kleinfelder, as CQA Monitor, may modify the mix design during construction should there be a <br /> change in the quality of import clay, equipment operations, or other factors. <br /> Kleinfelder will compile all the CQA testing data for the project in the final CQA report, certify <br /> construction of the barrier layer, and compile a site map to scale showing the location and results <br /> of all CQA testing. The map can be correlated to the as-built drawings produced by the SJDPW. <br /> Any changes to engineering during the project will be approved by the County Project Engineer <br /> and coordinated with the CQA Officer. <br /> 2.8 FIELD OBSERVATIONS <br /> Part time field observation of construction of the entire final cover will be provided by SJDPW <br /> field engineers. <br /> Kleinfelder will provide limited construction observation of the foundation and vegetative layers <br /> and full-time observation of construction of the barrier layer. <br /> The SJDPW will keep daily logs and provide summary reports to Kleinfelder for the duration of <br /> the project and coordinate field observation scheduling with Kleinfelder. <br /> GSM.-md CH/95 Page 10 of 31 July 14, 1995 <br /> 20-1008-36(CQACOR) Copyright 1995,Kleinfelder,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.