My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:24:32 AM
Creation date
7/3/2020 11:04:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1996.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-1008-36 <br /> July 14, 1995 <br /> 3.2.1 Project Administrator <br /> The Project Administrator has overall responsibility for the project. The Project Administrator <br /> will be Tom Horton, Integrated Waste Manager for the SJDPW, Solid Waste Division. As such, <br /> he will be consulted by involved parties on all matters of principle and policy, and he will approve <br /> any design modifications or regulatory conferences for the project. <br /> 3.2.2 Project Manager <br /> The Project Manager is responsible for confirming that the intent of the design is met. The <br /> Project Manager will be responsible for the implementation of any design changes that are <br /> required as a result of the observation of actual field conditions. Mr. Gabriel Karam, P.E., <br /> SJDPW, will serve as the Project Manager. He will also serve as Project Engineer and Engineer <br /> of Record as defined below. <br /> 3.2.3 Engineer of Record <br /> During the construction and any required redesign, the Engineer of Record will confirm that <br /> construction conforms with the design plans and specifications and that all design changes have <br /> been properly evaluated, documented, and approved by the regulatory authorities. The Engineer <br /> of Record must be a Registered Civil Engineer in the State of California. Mr. Gabriel Karam, <br /> P.E. will be the Engineer of Record for the project. <br /> 3.2.4 Survey Team <br /> The Survey Team performs all survey work on the site to measure and document the following: <br /> • Configuration of landfill prior to placing cap <br /> • Configuration of upper surface of foundation layer <br /> • Confirms that foundation layer is a minimum of 2-feet thick <br /> GSM.•md CH/95 Page 12 of 31 July 14, 1995 <br /> 20-1008-36(CQACOI) Copyright 1995,Kleinfelder,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.