My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:41:31 PM
Creation date
7/3/2020 11:04:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2011
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. General <br />All work shall be in accordance with applicable regulatory requirements. <br />Work may not start until the work crew is in possession of project design documents, provided <br />by Contractor. <br />A. Refuse and Site Housekeeping <br />At the end of each working day the Contractor shall either remove refuse excavated from <br />the site or place refuse in a covered bin. Contractor shall empty refuse bins within 24 <br />hours of a bin being full. Bins shall be emptied at facilities licensed to receive such <br />material. <br />Contractor shall remove meal trash and work trash from the work area, or place it in the <br />refuse bin, at the end of each working day. <br />B. LFG System Shut Down <br />Contractor shall not shut down the LFG systems without consent of the Engineer. <br />Contractor shall provide minimum of 48 hrs written notice for any need LFG system <br />shutdown and the duration of the shutdown to the Engineer. Engineer will notify San <br />Joaquin Valley Air Pollution Control District (AQMD) before approving any shutdown <br />request. <br />C. Labeling <br />Label well heads, valves, and valve boxes with oil-based paint indicating well number. <br />Clean surfaces prior to painting. Labeling shall be neat and professional in appearance <br />II. LFG Wells <br />Placement of rock, pipe, and other materials in the well bore — collectively referred to as <br />"Installation of the LFG well"- shall be in the presence of EHD. <br />III. Abandoning Boreholes <br />Notify the Engineer if an obstruction prevents the advance of the drill riga The Engineer may <br />dii cct the Contractor to abandon the borehole, and drill a replacement borehole. <br />Placement of material within the abandoned borehole shall be in the presence of EDH staff. <br />A. Abandoned boreholes in refuse: place soil within the borehole, moistening the soil <br />and compacting in 2 -ft lifts. <br />On - ;'r it LFG System Maintenance Contractor <br />Su oaquin County Purchasing Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.