Laserfiche WebLink
C <br />shutdowns all exposed surfaces shall be protected with special treatments <br />specified in Article 3.02 above. <br />B. Placing Requirements: <br />1. No material shall be placed on any portion of the subgrade or against or upon <br />any structure until the Engineer, has verified that this material meets these <br />specifications. <br />2. Prior to placement of materials, the in-place density of the underlying material <br />shall be as specified in Table 02200-2. <br />3. Place materials in conformance to the requirements of Table 02200-2. <br />4. Earthfill materials may require moisture conditioning (wetting or drying) prior <br />to placement and compaction. Some materials may require spreading and <br />extended drying time prior to placement and compaction. <br />Moisture -conditioning requirements shall be as specified in Table 02200-2. <br />5. Earthfill materials shall be placed in continuous and approximately uniform <br />lifts for their full length and width, unless otherwise specified or specifically <br />permitted by the Engineer. <br />6. Method of dumping and spreading materials shall ensure uniform distribution <br />of the material. <br />7. Loose thickness of each lift of materials shall be as specified in Table 02200-2. <br />8. Unless otherwise indicated, earthfill materials shall be placed to a grade no less <br />than 2 percent to facilitate drainage of water. In areas where ponding cannot <br />be prevented or ponding has occurred and fill is required to be placed, placing <br />shall begin only after the area is dewatered and permission is obtained from the <br />Engineer. <br />C. Compaction Requirements: <br />1. Each lift of earthfill material shall be compacted to the applicable minimum <br />relative compaction specified in Table 02200-2. <br />2. During compaction, uniform moisture distribution shall be obtained by <br />disking, blading, or other methods. <br />3. If the rolled surface of any in-place lift is too wet for proper compaction of the <br />next succeeding lift to be placed thereon, then the materials from the in-place <br />lift shall be removed and allowed to dry, or worked with harrow, scarifier, or <br />SHAW ENVIRONMENTAL, INC. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH—Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Site Earthwork <br />1 <br />02200-11 <br />