My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:32:56 AM
Creation date
7/3/2020 11:05:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012_1
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3.4 Trenching and Roadways <br /> As described in the construction specifications, the CQA Monitor will: <br /> a Verify depth and other dimensions <br /> ® Verify slope requirements <br /> • Determine whether construction activities are adversely impacting final cover components <br /> ® Verify geocomposite placement, if applicable <br /> ® Verify that backfill is being placed in accordance with the construction specifications <br /> ® Check proper backfill compaction and riprap placement if applicable <br /> ® Check moisture and density of compacted backfill by testing at the frequencies established <br /> in this plan <br /> ® Perform sampling and construction testing on trench backfill materials at the frequencies <br /> established in this plan <br /> ® Verify that completed grades are consistent with the construction drawings by reviewing <br /> as-built surveys with the Resident engineer <br /> 4.3.5 Vegetative Soil Layer <br /> As described in the "vegetative soil layer" Sections 02200 of the construction specifications, the CQA <br /> Monitor will: <br /> ® Verify that the source material for topsoil is capable of supporting native plant growth and <br /> meets the contract drawing requirements <br /> ® Monitor placement of material, and mark damage to the project components during <br /> material installation, and verify that damage is repaired <br /> ® Verify that the underlying geomembrane cover is installed correctly prior to placement <br /> ® Verify that layer thickness control is established <br /> ® Verify lift thickness <br /> ® Test compaction and moisture content at required frequencies <br /> ® Sample and perform classification testing at required frequencies <br /> ' • Verify that final grading meets slope requirements <br /> 4.4 Riprap <br /> CQA requirements for riprap and other runoff control features are specified in the construction <br /> specifications and discussed in this section. <br /> CH CQA Plan 041712 Rev2a.doc 4-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.