My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (1/08 TO 6/08)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (1/08 TO 6/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:38:57 PM
Creation date
7/3/2020 11:06:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (1/08 TO 6/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2008.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.0 Maintenance <br />Maintenance activities/schedules will be performed in accordance with <br />manufacturer's specifications outlined in CHSL's gas flare system O&M manual. A <br />copy of the manual is available at the flare station storage closet. <br />Maintenance activities include: <br />1. Inspecting and clean flame arresters as needed. <br />2. Rotating active/inactive blowers. <br />3. Lubricateing blower and drive motor bearings; check and adjust belts. <br />4. Checking the pilot fuel tank levels, and refilling them as necessary. <br />5. Checking Blower/flare station controller set points shall be checked and <br />adjusted as necessary. <br />6. Perform air compressor check/maintenance. <br />The LFG system contractor prepares monthly reports to the County containing the <br />data collected (in Microsoft Excel spreadsheet format) and a summary of all activity <br />performed during the reporting period. Maintenance repairs and/or system <br />modifications are recommended as required. Data summaries shall be attached to <br />reports on CD-ROM media or e-mailed to the County. <br />2.2 QUARTERLY PERIMETER MONITORING <br />Perimeter LFG migration monitoring probes are monitored quarterly in accordance <br />with Article 6 of Title 27, CCR. The contractor notifies the County within one (1) <br />hour of any condition of non-compliance with perimeter monitoring rules or <br />regulations. Monitored parameters include (see attached Data Sheet): <br />1 Date, time, and name of monitoring personnel <br />2 Meteorological conditions (e.g., wind direction and velocity, barometric <br />pressure, ambient temperature, general weather observations, etc) <br />3 Methane, oxygen and carbon dioxide gas concentrations <br />4 Testing protocols <br />5 Instrument calibration <br />2.3 SEMI-ANNUAL SURFACE EMISSION TEST <br />The contractor tests surface emissions in accordance with the surface emissions testing <br />protocol prepared by the County (Attachment A). All testing shall be scheduled with the <br />County, LEA and SJVAPCD. <br />LFG Operation And Maintenance Pan San Joaquin County <br />Corral Hollow Sanitary Landfill 7 Public Works Department <br />March 31. 2008 Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.