My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1994-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1994-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 9:24:25 AM
Creation date
7/3/2020 11:08:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1994-1998
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1990-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 10 <br /> 0 (11/92) <br /> Special <br /> SECTION 10 . CONSTRUCTION DETAILS <br /> SECTION 10-1 . GENERAL <br /> 10-1 . 01 ORDER OF WORK. --Order of work shall conform to <br /> the provisions in Section 5-1. 05, "Order of Work, " of the <br /> Standard Specifications and these special provisions . <br /> The clay barrier layer at location 2 (10+ acres) , shown on <br /> the plans, shall be placed, mixed, compacted to grade, testing <br /> completed and approved by the Engineer prior to beginning the <br /> mixing of the clay barrier layer on the remainder of the project . <br /> A testing period of 20 working days is anticipated for <br /> location 1. <br /> 10-1. 02 STAKING. --The Contractor shall lay out its work <br /> from owner-established base lines and bench marks indicated on <br /> the plans, and shall be responsible for all measurements in <br /> connection with the layout . The Contractor shall furnish, at its <br /> own expense, all stakes, templates, equipment, tools, material, <br /> and labor required to lay out any part of the work. The <br /> Contractor shall be responsible for executing the work to the <br /> lines and grades established by the owner. <br /> Full compensation for furnishing and setting all stakes <br /> necessary to construct the project shall be considered as <br /> included in the prices paid for the various contract items of <br /> work, and no additional compensation will be allowed therefor. <br /> (D:\SPECS\C0-10.3.) 10-1 <br /> D!\SP3C_C0.WX\HL$L_10.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.