My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:54:32 AM
Creation date
7/3/2020 11:08:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kn KLEINFELDER <br /> 6.2.3 Vegetative Layer <br /> Available onsite soils will be used to construct the vegetative layer. Soils with a high sand <br /> content will not be used due to their susceptibility to erosion and desiccation. The vegetative <br /> layer will be at least one-foot thick and will be compacted to a density of 80 to 85 percent. <br /> Higher levels of compaction will not be 4ccepted since the growth of vegetation may be <br /> inhibited. The plant seed shall be applied as soon as possible after completion of the <br /> vegetative layer or a section of the vegetative layer. <br /> 6.3 Results from Test Pad <br /> Kleinfelder evaluated the data from testing and developed minimum specifications for the <br /> construction of the barrier layer. The results of the test pad and the construction procedures <br /> and specifications recommended by Kleinfelder are in the form of a letter report to the <br /> Engineer, a copy of which is enclosed in Appendix D. <br /> GSM.MD 3EI94 Page 19 of 24 <br /> Copyright 1994 Kleinfelder,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.