Laserfiche WebLink
1.3 Monitoring Well Design <br /> • Well casing diameter:4" <br /> • Centralizer spacing: N/A <br /> • Borehole diameter: 10" <br /> • Construction materials:Schedule 40 PVC <br /> • Above ground completion with stove pipe and bollards <br /> • Type of well cap,bottom cap:Top-locking; Bottom-threaded <br /> • Size of perforations:0.010-inch <br /> • Grain size of sand pack and rationale: 2/16 Monterey Sand based on fine grained <br /> content of saturated materials <br /> • Thickness and position of bentonite seal and sand pack: Sand - top of pack 48 ft <br /> bgs, bentonite-top of sand,3 ft thick <br /> • Depth of well and position of perforated interval: Total depth - 70 ft, perforated <br /> interval-50-70 ft bgs <br /> • Length of screen:20 ft (0.010-inch) <br /> • Further details are illustrated in construction diagrams in Appendix B. <br /> 1.4 Well Development <br /> • Development:surge, bail,and pump method. <br /> • Completion determination:When all parameters have been stabilized. <br /> • Monitored Parameters during development: Turbidity, pH, temperature, dissolved <br /> oxygen,specific conductivity. <br /> • Water storage and disposal containerization:55-gal DOT approved drums. <br /> 1.5 Monitoring Well Survey <br /> • A licensed land surveyor located in Stockton, California,will survey the newly installed <br /> monitoring well upon completion. <br /> • Features to be surveyed:northing,easting,and top of casing. <br /> • Vertical accuracy will be measured to at least 0.01 foot. <br /> 1.6 Well Sampling <br /> • Monitoring well will not be sampled until 48-hours after the well has been developed. <br /> • Well purging method and amount of purge water: low flow in accordance with US <br /> EPA document titled Low-Flow (Minimal Drawdown) Ground-Water Sampling <br /> Procedures (EPA/540/S-95/504). <br /> • Monitoring well samples will be analyzed and evaluated as seen in Table 1 attached. <br /> • QA/QC procedures will include: trip blanks, temperature blanks and laboratory <br /> QA/QC samples. <br /> 2 <br /> Well Installation Workplan Stockton,Ca <br /> Cove Contractors,Inc. Project No.04.20090407.00 <br />