Laserfiche WebLink
GRANITE DAY TRAFFIC LIMITATION ZONE JAN.'Pr,:, l^cw. <br /> .. <br /> oiect o. B - n,��,�reka Road <br /> This project would widen from a single lane to 2 lanes the north side <br /> of Eureka Road easterly from Sierra College Blvd. approximately . 33 <br /> miles. The project would also reconstruct portions of Eureka Road to <br /> a minimally improved 2-lane standard from approximately .38 miles east <br /> of Sierra College Blvd. to Auburn-Folsom Road. Four-foot wide <br /> shoulders would be provided for the full length. Total project length <br /> is estimated at 6.06 lane-miles. <br /> project N®. 6 - Auburn-Folsom Read <br /> This project is a widening of existing 2-lane sections to 4 lanes be- <br /> tween the Sacramento County line and Joe Rogers Road. A -foot wide <br /> paved shoulder will be provided where concrete curb, gutter, and <br /> j sidewalk are required; an 8-foot wide paved shoulder will be provided <br /> in all other areas. Total project length is estimated at 4 . 08 lane- <br /> miles. <br /> 7 e <br /> This project would be the new construction of a 401 wide, 2-lane road- <br /> way between Barton Road and Auburn-Folsom Road. The funding program <br /> provides for engineering and environmental work and right-of-way ac- <br /> quisition for the future Rocklin Road Extension; it provides no fund- <br /> ing for construction. Total project length is estimated at 4 . 68 <br /> lane-miles. <br /> Ergjact U22 a - <br /> This project is the correction of horizontal and vertical alignment <br /> deficiencies in the existing 2-lane road near the Town of <br /> Loomis/Placer County boundary. Total project length is estimated at <br /> .50 lane-miles. <br /> oject NQ. 2 - Cavikt Staiiman Road Douglas Blvd. Connector <br /> This project is the new construction of a 2-lane roadway connecting <br /> Cavitt-Staliman Road with Douglas Blvd. approximately Goo feet east of <br /> sierra College Blvd. The connector would serve as a bypass of heavily <br /> congested intersections for local traffic using commercial areas near <br /> the Douglas Blvd./Sierra College Blvd. intersection. The project in- <br /> cludes concrete curb, gutter and sidewalk on both sides. The project <br /> includes construction of the intersections with Douglas Blvd. and <br /> Cavitt-stallman Road; traffic signal costs are not included. Total <br /> project length is estimated at .50 lane-miles. <br /> a <br /> e <br />