My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014 NOV TPR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieve Reports
>
ARCHIVED REPORTS_2014 NOV TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:14:45 PM
Creation date
7/3/2020 11:14:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014 NOV TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440011_9999 S AUSTIN_2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-12 <br /> Forward will remove litter from the neighboring offsite properties where access has been <br /> granted by the property owner. This would include litter that is caught by tree limbs. Forward <br /> will use the method (i.e., a litter extension pole) that is most effective and has the least <br /> amount of impact to the offsite property. <br /> Forward currently documents illegal dumping that occurs around or near the facility prior to <br /> clean up and documents spills and accidents that occur at or near the facility (see Section <br /> 3.4.3). <br /> Forward will also take photos of the litter before and after when there is an excessive amount <br /> of offsite litter. <br /> The site phone number ([209] 982-4298) is manned from 6:00 a.m. to 6:00 p.m., Monday <br /> through Friday and 6:00 a.m. to 12:00 p.m. on Saturday. All other times, the contracted <br /> security company will be available by phone to alert Forward personnel of any issues. For <br /> additional information, refer to Section 3.1.1.2 and Table 2 of this TPR. <br /> 3.2.4 Noise Control (14 CCR, Section 17408.3) <br /> In accordance with 14 CCR, Section 17408.3, noise control measures are instituted at the <br /> RRF. Noise at the site includes traffic noise generated by trucks and other vehicles traveling <br /> along on Austin Road to the landfill and RRF and noise generated by the equipment used in <br /> landfill and RRF operations. Noise levels of on site equipment are controlled by proper <br /> maintenance of mufflers to factory specifications. <br /> Due to the vehicular volume with the waste quantity limits, deliveries of residual waste to the <br /> landfill will be scheduled as regularly as possible to minimize queuing and idling. In addition, <br /> the truck drivers will be encouraged to minimize their idling time. <br /> Noise levels are not likely to create health hazards to persons using the site due to the use of <br /> mufflers on heavy equipment. Protective ear wear is provided to all employees. Due to the <br /> remote location of the site, noise levels are not likely to create health hazards to nearby <br /> residents. <br /> 3.2.5 Nuisance Control (14 CCR, Section 17408.5) <br /> In accordance with 14 CCR, Section 17408.5, the station is operated so as to not create a <br /> public nuisance, health or safety problem. All station personnel are trained to eliminate any <br /> aesthetic nuisance that may be created from daily operations. Operations are performed to <br /> prevent nuisances such as vector, bird and animal control; odor control; noise control; dust <br /> control; litter control; and traffic control as discussed in this TPR. Any complaints received <br /> from surrounding properties will be investigated and appropriate steps will be taken to <br /> remediate the nuisance. <br /> Forward Resource Recovery Facility SWT Engineering <br /> Transfer/Processing Report-November 2014 <br /> z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\tpr 2014\text\sec3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.