Laserfiche WebLink
well in the first stage of construction. The fire pump station will also be constructed <br /> in the first stage. This will assure that when the new Transfer Building is opened for <br /> operations that the water supply and fire water supply system will be operational. <br /> The new well and pump house is to be located in an area that is currently used for <br /> parking (See Drawing RSI-1) and ,therefore, the Station operations can continue in <br /> the current Station transfer areas while the new water supply systems are constructed. <br /> The well system will include a chlorination system for the domestic water supply. <br /> Although the water supply system is not a public system, the system will be designed <br /> to meet chlorination requirements for public systems. This will include an outdoor <br /> chlorination tank system in an enclosure near the supply well. The well system will <br /> meet requirements of County ordinances and regulations. <br /> C. Communications Facilities <br /> Following is a list of proposed communication facilities <br /> EQUIPMENT/FACILITY LOCATTON <br /> Walkie-Talkies Transfer Building, O&M Building, Scalehouse <br /> Telephones 4 locations: Transfer Building (4 each), Scalehouse, <br /> O&M Building and Firewater pumphouse <br /> Radios Trucks <br /> O&M Building <br /> Speaker intercom Between both remote scales and the Scalehouse (these <br /> remote speakers must have printers also for receipts). <br /> Underground electrical conduit will be provided for <br /> communications wiring. <br /> Signal lights Signal lights for each Non-Automated Disposal lane will <br /> be connected to the scalehouse so that the attendant can <br /> signal the next customer to approach the scalehouse. <br /> d. Lighting <br /> The majority of Station operations will be performed between the hours of 6 AM and <br /> 5 PM. Drawing RSI-8 shows proposed locations for outdoor pole mounted lighting <br /> of the Station. This lighting is primarily for security purposes during off hours. <br /> Lighting will be provided in the buildings. The Transfer building will be equipped <br /> with extensive translucent panels in the roof and exterior walls,as shown on Drawings <br /> RSI-3 and RSI-4, for natural lighting of the building to enhance artificial lighting <br /> provided. <br /> 07549001.012 39 September 23,1993 <br />