Laserfiche WebLink
2.4.9 Transfer Trailer Parking <br /> The transfer trailers will use this area for overnight parking only and not as a staging area. <br /> 2.4.10 Fuel Station <br /> Fueling will take place at the Fuel Station shown west of the Transfer Building, along the west <br /> exit road. The Fuel Station will provide diesel and gasoline fuel to the County-owned vehicles <br /> and equipment operating at the station. <br /> 2.4.11 Roadways <br /> All roadways will be striped and signed to facilitate traffic movement and traffic safety. The <br /> traffic lanes have been designated to emphasize vehicle segregation and to completely separate <br /> the general public from the transfer trailers and commercial vehicles. <br /> Pavement sections throughout the station will be suitable for heavy vehicles. As shown on Plate <br /> 3, Preliminary Grading Plan, maximum ramp slopes are 8% and the minimum turning radius <br /> for "transfer" lanes is 75 feet. <br /> 2.4.12 Drainage <br /> There are no off-site drainage facilities. The on-site drainage system will consist of a network <br /> of catch basins and pipes draining into an unlined retention pond, as shown on Plate 4, <br /> Preliminary Utility Plan. The retention pond will be located west of the Recycling Area and will <br /> collect and retain site storm drainage for percolation and evaporation. <br /> D VIF e_ stornfINlAWwater quality, the retention pond may have to bated <br /> therefore expanTM-300th if required by the Regional Water Quality Control Board. <br /> The Transfer Tunnel and the Recycling Area will be provided each with a sump and pump <br /> connected to the gravity on-site drainage system. Portable pumps will be available to provide <br /> proper drainage in the event of a power failure. <br /> 2.4.13 Utilities <br /> on Plate 4 Preliminary Utility The utilities fisted below are shown ary ty Plan. <br /> 2.4.13.1 Sanitary Sewer: Restroom facilities in the Office Building and the Scale House <br /> will be connected into a septic tank and leach field. <br /> 2.4.13.2 Water: The existing water system will remain in service until the new water <br /> system is operational. Two new fire protection tanks, a new general use water <br /> tank, and a new high pressure booster pump will be provided. Fire hydrants and <br /> water outlets will be provided throughout the site for fire protection, dust control <br /> and irrigation. <br /> C-11 <br />