My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1992-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
CORRESPONDENCE_1992-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 3:53:47 PM
Creation date
7/3/2020 11:16:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1992-2003
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_1992-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 2 <br />PC: 12-16-93 <br />ER-93-1/UP-93-4 <br />Page 9 <br />f. Landscaping shall be installed in accordance with the approved Site Plan and <br />Improvement Plan. Landscaping details shall be consistent with Chapter 9-1020 of the <br />Development Title, be included on the Improvement Plan, and be installed prior to <br />issuance of the Certificate of Occupancy for the office/maintenance building. <br />g. Litter shall be picked up on a daily basis on the project site and along the site's frontage <br />on MacArthur Drive. Litter shall be picked up on surrounding properties as needed. <br />h. Except for the wood and yard waste composting operations, all waste handling and <br />transfer operations shall take place within the approved transfer building. <br />All doors, windows, and unscreened openings at the transfer building shall remain closed <br />unless in actual use. <br />All new cuts and fills shall be consistent with the geotechnical recommendations <br />contained in Appendix F of the Final EIR. In areas where slopes are steeper than 2:1, the <br />following mitigation measure shall be implemented: regrade slopes to 2:1 or flatter, or set <br />back all improvements at least 30 feet from the top and bottom of slopes, or erect <br />landslide debris barriers. <br />k. Construction of fills, foundations, slabs, and roadways on the site shall be in accordance <br />with the geotechnical recommendations contained in Appendix F of the Final EIR. <br />Placement of plastic sheeting, debris fences, silt fences, and/or hay bales shall be utilized <br />to protect disturbed surfaces during storms during construction activities. Following <br />construction, all disturbed surfaces, especially slopes, shall be revegetated. <br />M. The area where the windrows will be located for the outdoor wood and yard waste <br />composting shall be paved. <br />n. Personnel working with the "load screening program" and on the "tipping floor' shall have <br />40 hours of OSHA training on spill containment, personal protective equipment, and the <br />handling of recyclable household hazardous materials. <br />o. Any mitigation monitoring done by the Community Development Department shall be <br />done on a time and materials basis paid for by the applicant. <br />2. AIR POLLUTION CONTROL DISTRICT: <br />a. A PM 10 Dust Prevention and Control Plan shall be prepared that includes the dust control <br />measures specified in Chapter 4.7, Mitigation 4.7-1, of the Final EIR. <br />b. A Standard Operating Procedure (SOP) shall be developed to address the elimination of <br />the generation and emission of odors as much as possible. The SOP shall include <br />measures to allow for the shortest possible holding time of waste brought to the facility, <br />as well as contingency measures in the event of excess odor generation and/or nuisance <br />complaint. 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.