My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1992-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
CORRESPONDENCE_1992-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 3:53:47 PM
Creation date
7/3/2020 11:16:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1992-2003
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_1992-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 2 <br />PC: 12-16-93 <br />ER-93-1/UP-93-4 <br />Page 10 <br />C. The tipping floor area and transfer trailers shall be cleaned daily. Transfer trailers shall <br />be periodically steam cleaned to remove accumulated grease and dirt. <br />3. DEPARTMENT OF FISH AND GAME: <br />a. In carrying out the operations of the project, the applicant shall take no actions that <br />violate the provisions of the State or Federal Endangered Species Acts or any regulations <br />promulgated pursuant thereto. Compliance with said laws shall be the sole responsibility <br />of the applicant, and the applicant shall agree to indemnify, defend, and hold the County <br />harmless from and against any claim or action by affected State or Federal agencies as <br />to the project's compliance with said laws. <br />b. Not more than 60 days prior to construction, a professional biologist retained by the <br />applicant shall conduct a preconstruction survey of the site for the presence of the San <br />Joaquin kit fox. If any kit foxes are found, precautions specified in Chapter 4.2, Mitigation <br />4.2-4, shall be taken. <br />C. Not more than 60 days prior to construction, a professional biologist retained by the <br />applicant shall conduct a preconstruction survey of the site for the presence of Burrowing <br />owls and avoid adverse impacts on Burrowing owls, if present, as specified in Chapter <br />4.2, Mitigation 4.2-6. <br />4. DEPARTMENT OF PUBLIC WORKS: <br />a. The driveway approaches with a right -turn lane at the north entrance shall be improved <br />in accordance with the requirements of San Joaquin County Standards R-17 and R-27 <br />prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br />b. Dedicate a 42 -foot -wide right-of-way from the centerline of MacArthur Drive to the property <br />line along the frontage of APN 253-130-19. (Development Title Section 9-1150.2) <br />C. MacArthur Drive from the south driveway to Linne Road shall be upgraded structurally to <br />provide for the difference between the present Traffic Index and the Traffic Index for the <br />proposed development. The upgrade shall be constructed in conformance with the <br />Improvement Standards and Specifications of the County of San Joaquin. All <br />improvement plans and specifications must be approved by the County of San Joaquin <br />Department of Public Works prior to approval of the Improvement Plan. (Development <br />Title Section 9-1150.2) <br />d. An encroachment permit shall be required for work within the road right-of-way. <br />(Development Title Section 9-1145.2) <br />e. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br />and payable prior to the time of building permit application. Eighty percent of the fee <br />may be deferred over a period not to exceed five years by entering into a Deferred Traffic <br />Impact Mitigation Fee Payment Agreement with the County. If deferred, the initial <br />payment is 20 percent of the total fee based on $249.99 per daily trip -end generated in <br />
The URL can be used to link to this page
Your browser does not support the video tag.