My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1992-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
CORRESPONDENCE_1992-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 3:53:47 PM
Creation date
7/3/2020 11:16:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1992-2003
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_1992-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ll <br />Item No. 2 <br />PC: 12-16-93 <br />ER-93-1/UP-93-4 <br />Page 16 <br />C. GEOLOGY/GEOTECHNICAL <br />C.1. Potentially Significant Impact: The proposed project would expose workers and project facilities <br />to seismic hazards. <br />Finding: <br />Changes or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the Final EIR. <br />Statement of Fact: <br />This impact will be reduced by the following: <br />Seismic design shall be in accordance with the Uniform Building Code (Seismic Zone 4), <br />as specified in the project geotechnical report contained in Appendix F of the Final EIR. <br />C.2. Potentially Significant Impact: Excavated and fill slopes at the proposed proiect site could <br />potentially fail causing injury, damage to facilities or burying solid waste material. <br />Finding: <br />Changes or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the Final EIR. <br />Statement of Fact: <br />This impact will be reduced by the following: <br />All new cuts and fills shall be consistent with the geotechnical recommendations <br />contained in Appendix F of the Final EIR. In areas where slopes are steeper than 2:1, the <br />following mitigation measure shall be implemented: regrade slopes to 2:1 or flatter, or set <br />back all improvements at least 30 feet from the top and bottom of slopes, or erect <br />landslide debris barriers. <br />C.3. Potentially Significant Impact: Existing surface soils are inadequate to support foundations for the <br />proposed project facilities. <br />Changes or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the Final EIR. <br />Statement of Fact: <br />This impact will be reduced by the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.