Laserfiche WebLink
Item No. 2 <br />PC: 12-16-93 <br />ER-93-1/UP-93-4 <br />Page 22 <br />professional biologist retained by the applicant shall conduct a preconstruction survey for the <br />burrowing owls if present, as specified in Chapter 4.2, Condition 4.2-6, of the Final EIR. <br />Monitoring Requirement: Review of survey results prior to construction. <br />Person/Agency Responsible: San Joaquin County Community Development Department, <br />Department of Fish and Game. <br />Timing or Frequency of Monitoring: Within 60 days of construction. <br />Geology/Geotechnical: <br />Mitigation Measure: Seismic design shall be in accordance with the Uniform Building Code <br />(Seismic Zone 4), as specified in the project geotechnical report continued in Appendix F of the <br />EIR. <br />Monitoring Requirement: Incorporate into building plans submitted for plan check prior <br />to building permit issuance. <br />Mitigation Measure: All new cuts and fills shall be consistent with the geotechnical <br />recommendations contained in Appendix F of the EIR. In areas where slopes are steeper than <br />2:1 the following mitigation measure shall be implemented: regrade slopes to 2:1 or flatter, or <br />setback all improvements at least 30 feet from the top and bottom of slopes, or erect landslide <br />debris barriers. <br />Monitoring Requirement: Incorporate into grading plans submitted for plan check prior <br />to grading permit issuance. <br />Person/Agency Responsible: San Joaquin County Building Inspection Division. <br />Timing or Frequency of Monitoring: Prior to issuance of grading permits. <br />Mitigation Measure: Construction of fills, foundations, slabs and roadways on-site shall be in <br />accordance with the geotechnical recommendations contained in Appendix F of the EIR. <br />Monitoring Requirement: Incorporate into building and grading plans submitted for plan <br />check prior to grading permit issuance. <br />Person/Agency Responsible: San Joaquin County Building Inspection Division. <br />Timing or Frequency of Monitoring: Prior to issuance of grading and/or building permits. <br />Person/Agency <br />Responsible: <br />San Joaquin County Building Inspection Division. <br />Timing or Frequency <br />of Monitoring: Prior to issuance of building permits. <br />Mitigation Measure: All new cuts and fills shall be consistent with the geotechnical <br />recommendations contained in Appendix F of the EIR. In areas where slopes are steeper than <br />2:1 the following mitigation measure shall be implemented: regrade slopes to 2:1 or flatter, or <br />setback all improvements at least 30 feet from the top and bottom of slopes, or erect landslide <br />debris barriers. <br />Monitoring Requirement: Incorporate into grading plans submitted for plan check prior <br />to grading permit issuance. <br />Person/Agency Responsible: San Joaquin County Building Inspection Division. <br />Timing or Frequency of Monitoring: Prior to issuance of grading permits. <br />Mitigation Measure: Construction of fills, foundations, slabs and roadways on-site shall be in <br />accordance with the geotechnical recommendations contained in Appendix F of the EIR. <br />Monitoring Requirement: Incorporate into building and grading plans submitted for plan <br />check prior to grading permit issuance. <br />Person/Agency Responsible: San Joaquin County Building Inspection Division. <br />Timing or Frequency of Monitoring: Prior to issuance of grading and/or building permits. <br />