My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1992-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
CORRESPONDENCE_1992-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 3:53:47 PM
Creation date
7/3/2020 11:16:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1992-2003
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_1992-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 2 <br />PC: 12-16-93 <br />ER-93-1/UP-93-4 <br />Page 23 <br />Mitigation Measure: Placement of plastic sheeting, debris fences, silt fences, and/or hay bales <br />to protect disturbed surfaces during storms during construction. Following construction, all <br />disturbed surfaces, especially slopes, shall be revegetated. <br />Monitoring Requirement: On-site inspection. <br />Person/Agency Responsible: San Joaquin County Community Development Department. <br />Timing or Frequency of Monitoring: As necessary during construction, prior to issuance <br />of Certificate of Occupancy. <br />WATER RESOURCES <br />Mitigation Measure: Construction of on-site drainage system, as proposed. The <br />evaporation/collection pond that will collect surface runoff from the active working area of the yard <br />and wood waste area shall be lined. <br />Monitoring Requirement: Show on Improvement Plan. <br />Person/Agency Responsible: San Joaquin County Community Development Department. <br />Timing or Frequency of Monitoring: Improvement Plan. <br />Mitigation Measure: All surface areas involved in the transporting, processing, or storage of waste <br />shall be paved or lined and drained to a catchment facility. <br />Monitoring Requirement: Show on Improvement Plan. <br />Person/Agency Responsible: San Joaquin County Community Development Department. <br />Timing or Frequency of Monitoring: Improvement Plan. <br />Mitigation Measure: The proposed receiving and processing operations shall take place within <br />covered and paved facilities. The outdoor wood and yard waste composting area shall be lined <br />paved. The transfer station building shall be constructed such that storm runoff does not come <br />into contact with waste or recovered materials. Liquids leached from the received waste and <br />wash down water shall be directed into holding tanks or lined evaporation ponds. <br />Monitoring Requirement: Show on building plans and on Improvement Plan. <br />Person/Agency Responsible: San Joaquin County Building Inspection, San Joaquin <br />County Community Development Department. <br />Timing or Frequency of Monitoring: Improvement Plan, prior to issuance of Building <br />Permit. <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.