Laserfiche WebLink
of the parking spaces shall be consistent with the requirements of Chapter 9-1015 of the development Title. <br /> The spaces shall be installed prior to issuance of the Certificate of Occupancy for the new structures and <br /> shall be permanently paved with concrete or asphalt concrete and be delineated. Bumper guards shall be <br /> provided where necessary to protect structures or properties. There shall be no truck or automobile <br /> parking associated with the approved use on MacArthur Drive. (Development Title Section 9-1015(e)) <br /> 4. Time number and location of handicapped parking spaces shall be consistent with Section 9-1015.10 of the <br /> Development Tide. <br /> 5. Any proposed parking lot or security lighting shall be designed to confine direct rays to the premises. No <br /> over beyond the property line shall be permitted,except onto public thoroughfares,provided,however, <br /> that such light shall not cause a hazard to motorists. Lighting details shall be shown on the Improvement <br /> Plan. (Development Title Section 9-1015.5((g)(4)) <br /> 6. Landscaping shall be installed in accordance with the approved Site Plan and Improvement Plan. <br /> I.andscaping details shall be consistent with Chapter 9-1020 of the Development Title, be included on the <br /> Improvement Plan, and be installed prior to issuance of the Certificate of Occupancy for the <br /> office/maintenance building. <br /> 7. Utter shall be picked up on a daily basis on the project site and along the sites frontage on MacArthur <br /> Drive. Litter shall be picked up on surrounding properties as needed. <br /> 8. Except for the wood and yard waste composting operations,all waste handling and transfer operations shall <br /> take place within the approved transfer building. <br /> 9. All doors, windows, and unscreened openings at the transfer building shall remain closed unless in actual <br /> use. <br /> 10. All new cuts and fills shall be consistent with the geotechnical recommendations contained in Appendix F <br /> of the Final EIR. In areas where slopes are steeper than 2:1 the following mitigation measure shall be <br /> implemented: regrade slopes to 2:1 or flatter,or set back all improvements at least 30 feet from the top <br /> and bottom of slopes, or erect landslide debris barriers. <br /> 11. Construction of fills, foundations,slabs and roadways on-site shall be in accordance with the geotechnical <br /> recommendations contained in Appendix F of the Final EIR. <br /> 12. Placement of plastic sheeting, debris fences, silt fences and/or hay bales shall be utilized to protect <br /> disturbed surfaces during storms during construction activities. Following construction, all disturbed <br /> surfaces, especially slopes, shall be revegetated. <br /> 13. The area where the windows will be located for the outdoor wood and yard waste composting shall be <br /> paved. <br /> 14. Personnel working with the "load screening program" and on the "tipp'mg floor" shall have 40 hours o� <br /> OSHA training on spill containment, personal protective equipment, -'and- the.-handling of recyclable <br /> household hazardous materials. <br /> 15. Any mitigation monitoring done by the Community Development Department shall be done on a time and <br /> materials basis paid for the applicant. <br /> 16. A PM10 Dust Prevention and Control Plan shall be prepared that includes the dust control measures <br /> L:/PR0J'ECT1397/1vW/RS1-1.TCY <br /> Revision 1.0 11 December 15, 1993 <br />