Laserfiche WebLink
11 <br />h) LANDSCAPING: Landscaping shall be provided and comply with the following: <br />i) All areas not used for buildings, parking, driveways, walkways, approved outdoor storage <br />areas, or other permanent facilities shall be landscaped. (Development Title Section 9-1020.8)) <br />ii) Areas of the property which are not part of the project shall be barricaded from traffic and <br />kept mowed and dust free. <br />iii) Placement of plastic sheeting, debris fences, silt fences, and/or hay bales shall be utilized to <br />protect any disturbed surfaces during construction activities. Following construction, all <br />disturbed surfaces shall be revegetated. <br />i) SCREENING: Screening shall be provided and comply with the following: <br />i) All storage materials and related activities shall be consistent with Development Title <br />Section 9-1022, including storage areas for trash, shall be screened so as not to be visible <br />from adjacent properties and public rights-of-way. <br />j) LITTER CONTROL: <br />i) Daily inspection will be conducted to control litter on- and off-site, including along MacArthur <br />Road. <br />i) Operator is to maintain an updated Odor Impact Minimization Plan (OIMP) with the San <br />Joaquin County Environmental Health Department. <br />Compost feedstockbe processed days of - •:: and commercial food waste <br />shall be processed 48 hours of • <br />iii) Commercial food waste composted on-site shall use a covered aerated static pile systems <br />that encompasses the compost feedstock and forces air through a bio -filter to minimize odor <br />generation (or other technology approved by the San Joaquin Valley Air Pollution Control <br />District with equivalent odor control), <br />iv) Composting operations shall occur on a paved surface to minimize ponding and anaerobic <br />conditions that could generate odors; and compost windrows shall not be turned when winds <br />exceed 25 miles per hour to minimize odor generation. <br />1) OUTDOOR PROCESSING OPERATION: <br />i) All outdoor processing activity shall not begin before 6:00 am and will not operate after <br />10:00 pm. <br />ii) Except for the wood processing and yard and food waste composting operations, appliance <br />recycling, and mixed construction and demolition/inert debris processing, all waste handling <br />and transfer operations shall take place within the transfer building. <br />iii) The outdoor area where the windrows will be located for yard waste composting and outdoor <br />wood, construction and demolition/inert debris processing shall be paved. <br />Conditions of Approval - 3 - <br />PA -0800005 <br />