My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:46:02 AM
Creation date
7/3/2020 11:17:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_2
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measure <br />• General Watering: The <br />construction contractor shall <br />control fugitive dust emissions <br />during land clearing, grubbing, <br />scraping, excavation, land <br />leveling, grading, cut and fill, <br />j and demolition activities by <br />j watering the construction site a <br />minimum of two times daily <br />when soil conditions are dry. <br />• Dirt Hauls: When materials are <br />transported offsite, the <br />! construction contractor shall <br />i <br />ensure that all material is <br />covered or effectively wetted to <br />limit visible dust emissions, and <br />i at least 24 inches of freeboard <br />space from the top of <br />containers shall be maintained. <br />• Dirt Carryout/Trackout: The <br />jconstruction contractor shall <br />install and maintain an <br />approved carryout and trackout 1 <br />! prevention procedure (e.g., <br />grisslies, gravel pads, paved <br />interior roads) at the <br />i construction ingress/egress. <br />The construction contractor <br />shall remove mud or dirt that <br />has accumulated on adjacent <br />public streets at the end of <br />each workday. In addition, i <br />carryout/trackout shall be ; <br />immediately removed when it <br />extends 50 feet or more <br />beyond the site exit. i <br />i Carryout/trackout shall be <br />removed by manually l <br />sweeping, using a rotary brush <br />broom accompanied or <br />preceded by sufficient wetting, <br />operating a PM10-efficient <br />street sweeper with a minimum <br />pick-up efficiency of 80 percent, ! <br />or flushing with water if curbs or <br />i gutters are not present and j <br />where the use of water will not <br />be a source of trackout material <br />or result in adverse impacts on <br />stormwater drainage systems. <br />Conditions of Approval <br />_ <br />Implementing Timing of <br />Method of Verification Party Verification Monitoring Party <br />-12- <br />PA-0800005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.