Laserfiche WebLink
. Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 23 <br /> Mitigation Measure: placement of plastic sheeting, debris fences, silt fences, and/or hay bales <br /> to,protect,disturbed surfaces during storms duriri con traction, Following construction <br /> disturbed surfaces, especially slopes, shall be revegetated. , all <br /> Monitoring Requirement: On-site inspection'. <br /> PersonlAgencv RPS onsible: San Joaquin-county Community Development Department, <br /> Timing or Freouencv of Monir2r 1: As necessary during construction, pri <br /> of Certificate of Occupancy. or to issuance <br /> WATER RESOURCES <br /> Mitigation Measure: Construction of on-site drainage <br /> System, as proposed. The <br /> evaporation/collection pond that will collect surface runoff from the active working area of the yard <br /> and wood waste area shall be lined. <br /> Monitoring Renuirement: Show on Improvement Pian. <br /> Person/Agency Respo� risitlP: San Joaquin County Community Development Department <br /> Timm or Fre uen .of Mon' <br /> r qg : Improvement Plan. <br /> Mitigation Measure: All surface areas involved In the transporting,processing, or storage of waste <br /> shall be paved or lined and drained to a catchment facility. <br /> Monitoring Requirement: Show ori Improvement Pian. <br /> Person/Agency Responsible: San Joaquin County Community Development Department <br /> Timing or Frepuenc.� of Monitoring: Improvement Plan. <br /> Mitigation Measure; <br /> The proposed receiving and processing operations shall take place within <br /> covered and paved facilities. The outdoor wood and yard waste composting area shall be HA Q <br /> into contact with waste or recovered materials. <br /> aved. The transfer station building shall be constructed such that storm runoff does not come <br /> wash down water shall be directed into holding tLiquids leached from the received waste and <br /> anks or lined evaporation ponds. <br /> Monitoring Requirement: Show on building plans and on Improvement Plan. <br /> Person/Agency Responsible: San Joaquin County Building Inspection, San Joaquin <br /> County Community Development Department. <br /> Timing or Frequency of Monitoring: Improvement Plan, prior to issuance of Building <br /> Permit. <br /> 1 . <br />