My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2.2 Responsibilities of the Contractor <br /> The Earthwork and Geosynthetics Contractors are responsible for constructing their portion of the <br /> project in conformance with the Construction Drawings,Specifications,and this CQA Manual.The <br /> Earthwork and Geosynthetics Contractors must allow and assist the QA/QC Consultant in <br /> performing the required monitoring.The Earthwork Contractor will provide construction surveys,as <br /> required by the Specifications.The Geosynthetics Contractor must provide all equipment to perform <br /> testing of geomembrane seams as required by the Specifications and provide as-built panel layouts. <br /> The Earthwork and Geosynthetics Contractors shall provide all necessary equipment required to <br /> complete the work in accordance with the Specifications. <br /> 2.2.3 Responsibilities of the QA/QC Manager <br /> The QA/QC Manager monitors implementation of the CQA program. He shall have formal <br /> academic training in engineering, engineering geology,or a closely related discipline and will be a <br /> registered civil engineer or certified engineering geologist in the State of California. <br /> CQA procedures and reports must be reviewed by the QA/QC Manager for compliance with the <br /> project CQA Manual. The QA/QC Manager acts as an auditor to verify and document the proper <br /> and complete implementation of the CQA program. The QA/QC Manager has authority to identify <br /> deficiencies and implement corrective action to the CQA program. The QA/QC Manager collects, <br /> distributes, and addresses disposition of Contractor submittals approved by the Design Engineers. <br /> The QA/QC Manager coordinates testing with independent testing laboratories and maintains record <br /> drawings. The QA/QC Manager reports directly to the Construction Manager. The QA/QC Manager <br /> will be responsible for preparation of the final CQA report. <br /> 2.2.4 Responsibilities of the QA/QC Inspectors <br /> QA/QC inspection personnel will have formal training and practical experience in inspecting and <br /> testing construction work,including conducting and recording inspection activities,preparing daily <br /> reports, and performing field testing. In addition, knowledge of codes and regulations involving <br /> material handling, observation of testing procedure, equipment, and reporting procedures will be <br /> required. <br /> The QA/QC inspection personnel will perform various tests and observations during construction <br /> such as: <br /> - Ensuring that all testing equipment is properly calibrated on a regular basis and that the <br /> calibration is documented <br /> - Accurately recording all test data and organizing them in a manner that allows easy <br /> reference <br /> - Evaluating the Contractor's construction quality control plan to ensure that it meets or <br /> isexceeds the CQA Manual requirements <br /> Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.