My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Reporting observations and test results as the work progresses s <br /> The QA/QC inspection personnel will work under the supervision and guidance of the QA/QC <br /> Manager. Inspection personnel will perform onsite inspections of the construction and determine <br /> whether the work meets the requirements of the Construction Drawings and Specifications. Field <br /> tests and visual observations will be used to evaluate construction practices. If QA/QC inspection <br /> personnel observe poor construction practices,the QA/QC Manager will be notified immediately. <br /> QA/QC inspection personnel will be responsible for verifying that all testing is conducted in <br /> accordance with American Society for Testing Materials(ASTM) standards or other specified test <br /> methods and that the proper test equipment is used. The results of all inspections, including work <br /> that is unacceptable, will be reported to the QA/QC Manager. <br /> 2.2.5 Responsibilities of the Design Engineer <br /> The Design Engineer is responsible for site engineering services related to the design. Those <br /> services include reviewing Contractor submittals,resolving technical issues related to construction, <br /> providing interpretation of the Construction Drawings and Specifications and approving substantial <br /> design modifications and technical revisions. <br /> 2.3 Control of Documents, Records, and Forms <br /> 2.3.1 Project Control of Contract Documents <br /> Contract documents, including Specifications, Construction Drawings, and change orders, are <br /> controlled by the Construction Manager. The Construction Manager maintains one or more copies <br /> of the most current set of contract documents for use by the QA/QC Consultant. Upon issuance of <br /> new copies or revisions,it is the responsibility of the Construction Manager to notify the Earthwork <br /> and Geosynthetic Contractors of the revisions and provide revised contract documents. The <br /> Construction Manager also provides the latest revised set of contract documents to the QA/QC <br /> Consultant. <br /> 2.3.2 Project Control of As-Built Information <br /> The QA/QC Manager controls as-built information generated by the Owner,Contractor and QA/QC <br /> Consultant. During the progress of the work, the QA/QC Manager obtains as-built information <br /> provided from the QA/QC Inspectors, Contractor, surveyors, or others. The as-built information <br /> shall be incorporated in the final CQA report. <br /> 2.3.3 Project Control of Forms <br /> Daily report forms,test report forms,and other project forms are controlled by the QA/QC Manager <br /> who maintains a master of each form for copies. Upon issuance of a new form,the QA/QC Manager <br /> must recall and remove all superseded copies along with the master,notify the QA/QC Inspectors, <br /> and provide new copies for their use. <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.