My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3.4 Processing Daily Reports <br /> The QA/QC Inspectors write a daily record of work progress. The daily reports are reviewed by the <br /> QA/QC Manager for legibility, clarity, traceability, and completeness. The review must be <br /> evidenced by signature. A weekly summary construction report will be prepared by the QA/QC <br /> Consultant and submitted to the Construction Manager. <br /> 2.3.5 Processing Test Reports <br /> A test report must be completed by the QA/QC Inspectors whenever testing is performed. The test <br /> reports must be reviewed by the QA/QC Manager. The review includes a check for mathematical <br /> accuracy,conformance to test requirements,conformance to specifications,and for clarity,legibility, <br /> traceability,and completeness. The review must be evidenced by a signature of the reviewer. Test <br /> reports(or summaries)from independent testing laboratories will also be transmitted to the QA/QC <br /> Manager for review. <br /> 2.3.6 Processing Project Records <br /> Project records are completed as needed. Use of the project records is limited to the scope for which <br /> they are intended. The record must be completed by filling in all of the blanks provided on the form, <br /> followed by the signature of the individual completing the form. All project records must be <br /> maintained at the site. <br /> 2.4 Documentation and Control of Non-Conformance <br /> 2.4.1 Observation of Non-Conformance <br /> Whenever a non-conformance is discovered or observed in the construction process, product,job <br /> related materials,documentation,or elsewhere,the QA/QC Manager and QA/QC Inspectors should <br /> first notify the foreman or superintendent supervising the work in question. The QA/QC Manager <br /> should then notify the Construction Manager. <br /> 2.4.2 Determining Extent of Non-Conformance <br /> Whenever a non-conformance is discovered or observed in the construction process,product,job- <br /> related materials,documentation,or elsewhere,the QA/QC Consultant will determine the extent of <br /> the non-conformance. The extent of the deficiency may be determined by additional sampling, <br /> testing, observations,review of records, or any other means deemed appropriate. <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.