Laserfiche WebLink
be done at the EARTHWORK CONTRACTOR's sole expense. <br /> 4. All materials shall meet specifications whether from samples taken from <br /> borrow sources or materials placed in the field. Materials for which borrow <br /> source samples meet Specification requirements but field samples taken do <br /> not, shall be rejected, removed and replaced at the EARTHWORK <br /> CONTRACTOR's sole expense. <br /> 5. Table 02300-1 summarizes control testing frequencies required for each <br /> imported component. The EARTHWORK CONTRACTOR shall perform <br /> all imported material control testing for imported materials supplied by the <br /> EARTHWORK CONTRACTOR. <br /> Table 02300-1 <br /> Imported Material Control Testing Frequency <br /> Test Granular Drainage Coarse Gravel <br /> (ASTM Designation) Material(cy) (cy) <br /> Particle Size(ASTM D422) 5,000 500 <br /> Laboratory Hydraulic Conductivity(ASTM -- 500 <br /> 2434) <br /> Soil Classification(ASTM D2488,D2487) Continuous Continuous <br /> B. Imported materials hauled by the EARTHWORK CONTRACTOR to the Project <br /> site shall be protected by the EARTHWORK CONTRACTOR from precipitation, <br /> inundation, and contamination by dust or other materials until they are placed in <br /> their completed and compacted course. <br /> 1.5 LIMIT OF EQUIPMENT ACCESS <br /> A. Equipment access in the active composting areas shall be restricted as directed by <br /> the QA/QC CONSULTANT and the OWNER. <br /> 1.6 WATER FOR COMPACTION AND MOISTURE CONTROL <br /> A. Water for use in compaction and dust control will be provided to the <br /> EARTHWORK CONTRACTOR at Forward's well standpipe as shown on the <br /> Construction Drawings. The EARTHWORK CONTRACTOR shall be <br /> responsible for transport of water from well. <br /> 1.7 SHORING, SHEETING, BRACING, AND SLOPING <br /> A. Install and maintain shoring, sheeting, bracing, and sloping necessary to support <br /> the sides of excavations, to keep and to prevent any movement that may damage <br /> adjacent facilities, or endanger life and health. Install and maintain shoring, <br /> sheeting, bracing, and sloping as required by OSHA and other applicable <br /> governmental regulations and agencies. <br /> 1.8 EXCAVATION SAFETY <br /> Forward Compost Facility Stormwater Improvements <br /> 02300 3 EARTHWORK <br />