My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be done at the EARTHWORK CONTRACTOR's sole expense. <br /> 4. All materials shall meet specifications whether from samples taken from <br /> borrow sources or materials placed in the field. Materials for which borrow <br /> source samples meet Specification requirements but field samples taken do <br /> not, shall be rejected, removed and replaced at the EARTHWORK <br /> CONTRACTOR's sole expense. <br /> 5. Table 02300-1 summarizes control testing frequencies required for each <br /> imported component. The EARTHWORK CONTRACTOR shall perform <br /> all imported material control testing for imported materials supplied by the <br /> EARTHWORK CONTRACTOR. <br /> Table 02300-1 <br /> Imported Material Control Testing Frequency <br /> Test Granular Drainage Coarse Gravel <br /> (ASTM Designation) Material(cy) (cy) <br /> Particle Size(ASTM D422) 5,000 500 <br /> Laboratory Hydraulic Conductivity(ASTM -- 500 <br /> 2434) <br /> Soil Classification(ASTM D2488,D2487) Continuous Continuous <br /> B. Imported materials hauled by the EARTHWORK CONTRACTOR to the Project <br /> site shall be protected by the EARTHWORK CONTRACTOR from precipitation, <br /> inundation, and contamination by dust or other materials until they are placed in <br /> their completed and compacted course. <br /> 1.5 LIMIT OF EQUIPMENT ACCESS <br /> A. Equipment access in the active composting areas shall be restricted as directed by <br /> the QA/QC CONSULTANT and the OWNER. <br /> 1.6 WATER FOR COMPACTION AND MOISTURE CONTROL <br /> A. Water for use in compaction and dust control will be provided to the <br /> EARTHWORK CONTRACTOR at Forward's well standpipe as shown on the <br /> Construction Drawings. The EARTHWORK CONTRACTOR shall be <br /> responsible for transport of water from well. <br /> 1.7 SHORING, SHEETING, BRACING, AND SLOPING <br /> A. Install and maintain shoring, sheeting, bracing, and sloping necessary to support <br /> the sides of excavations, to keep and to prevent any movement that may damage <br /> adjacent facilities, or endanger life and health. Install and maintain shoring, <br /> sheeting, bracing, and sloping as required by OSHA and other applicable <br /> governmental regulations and agencies. <br /> 1.8 EXCAVATION SAFETY <br /> Forward Compost Facility Stormwater Improvements <br /> 02300 3 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.