Laserfiche WebLink
' 20 June 2006 <br /> AGE-NC Project No. 01-0839 <br /> ' Page 2 of 8 <br /> ' Guidance Manual for Hazardous Waste Site Activities (National Institute for Occupational Safety <br /> and Health Administration, U.S. Coast Guard and U.S. Environmental Protection Agency, 1985). <br /> Prior to drilling activities, the proposed drilling locations will be clearly marked and a utility <br /> ' clearance obtained through Underground Service Alert. <br /> ' 2.2. SOIL BORING ADVANCEMENT <br /> AGE proposes to advance one soil probe boring using a CME-75HT truck-mounted drill rig <br /> equipped with 8.25-inch hollow-stem augers as part of site assessment activities.The soil boring will <br /> be advanced to assess the vertical and lateral extents of petroleum hydrocarbon-impacted soil and <br /> ground water. Based on the distribution of hydrocarbon contamination encountered to date during <br /> ' the ongoing investigation,AGE proposes to advance the soil boring approximately 36 feet northeast <br /> of monitoring well MW-1, in the planter on the eastern edge of the property(Figure 2). The boring <br /> will be advanced to approximately 80 feet below surface grade(bsg);total depth of the boring may <br /> ' vary according to hydrogeologic conditions encountered during drilling activities. <br /> First-encountered ground water and selected soil samples will be analyzed by a California <br /> ' Department of Health Services (DHS)-certified laboratory for: <br /> ' • Total petroleum hydrocarbons quantified as gasoline(TPH-g) in accordance with EPA <br /> Method 8015M; and <br /> • Benzene,toluene,ethylbenzene,and total xylenes(BTEX)and fuel additives methyl tertiary- <br /> butyl ether(MTBE),tertiary-butyl alcohol(TBA),di-isopropyl ether(DIPE), ethyl tertiary- <br /> butyl ether(ETBE),tertiary-amyl methyl ether(TAME), 1,2-dibromoethane(EDB),and 1,2- <br /> dichloroethane (1,2-DCA) in accordance with EPA Method 8260B. <br /> Laboratory reports for the soil analyses,testing methods,laboratory quality assurance/quality control <br /> t (QA/QC) reports, and sample chain of custody documentation will be presented in a report with <br /> findings and recommendations. <br /> 1 2.3. WELL DRILLING AND SOIL SAMPLE COLLECTION <br /> ' AGE proposes to advance six pilot soil borings at the site for the installation of one ground water <br /> monitoring well and five SVE wells. Using a CME-75HT truck-mounted drill rig equipped with <br /> 8.25-inch hollow-stem augers,the monitoring well pilot soil boring will be advanced to a depth of <br /> 80 feet bsg;three of the SVE well pilot borings will be advanced to a depth of approximately 30 feet <br /> bsg and two SVE well pilot soil borings will be advanced to a depth of 60 feet bsg. The total depth <br /> of each well boring may vary according to geologic/hydrogeologic conditions encountered during <br /> Advanced GcoEnvironmental,Inc. <br />