Laserfiche WebLink
Hazardous Waste Contingency Plan <br /> hazardous waste constituents to air , soil or surface water. It will also make them aware of hazardous <br /> waste spill prevention and response procedures , as well as , related regulatory requirements . <br /> This Plan includes contact information ( name , address , phone number) for primary and alternate <br /> emergency coordinators , a list of emergency equipment , a figure showing where the equipment is <br /> located , an evacuation plan , and emergency response steps for incidents involving hazardous waste <br /> at the Site . It identifies potential hazards , details emergency action procedures , including response <br /> functions and support organizations ( both internal and external resources) , and describes the <br /> required reporting documentation and investigative follow- up for a hazardous waste incident . <br /> The Home Depot maintains a robust Handling Hazardous Materials Standard Operating Procedure <br /> ( HHM SOP ) for its Supply Chain locations , which is regularly updated and available electronically to <br /> Associates . This comprehensive program effectively prevents the release of hazardous materials <br /> and aggressively protects the environment . The HHM SOP outlines the measures that The Home <br /> Depot will take to contain and clean up spilled materials . It also outlines Home Depot' s third party <br /> contractor programs and responses . <br /> Activities that represent potential hazard from fire , explosion , or release due to hazardous waste <br /> storage at the Site are minimal . Any hazardous waste generated is stored in the 90 - day storage area <br /> termed the Handling Hazardous Materials Automated ( HHMA) Central Storage Area ( CSA) — located <br /> on the southwest side of the Site building . A fire or explosion hazard would not be anticipated at the <br /> potential concentrations of hazardous waste constituents present in the waste . <br /> Current Revision Date and Amendments <br /> According to Title 40 CFR Part 265 . 54 , the Plan must be reviewed and immediately amended when : <br /> • Applicable regulations are revised ; <br /> • The plan fails in an emergency ; <br /> • The Site changes - in its design , construction , operation , maintenance , or other <br /> circumstances - in a way that materially increases the potential for fires , explosions , or <br /> releases of hazardous waste or hazardous waste constituents , or changes the response <br /> necessary in an emergency ; <br /> • The list of emergency coordinators changes ; or, <br /> The list of emergency equipment changes ; <br /> Table 1 provides a list of revisions made to the contingency plan . <br /> l � <br /> i <br /> arcadis . com 4 <br /> l_� <br />