Laserfiche WebLink
MHP 06 '89 22:40 E,CELT!CH/S_ F <br />I <br />P.6 <br />4n, Bcone Station EXCELTECH March 6, 1986 <br />Page 4 <br />Project No. 2419D <br />i. <br />�• Because theme assumptions are rarefy met under normal field conditions, the <br />values determined with these an techniques should be considered <br />best estimates only. <br />The graphed data are attached. <br />3.1 r n T <br />Prior to the pumping test, background static water levels were monitored for <br />up to 24 -hours. Background testing at this site occurred on February 15 and <br />February 16, 1988. The purpose of this test was to examione the normal <br />ground -water surface conditions, paying particular attention to any <br />anomalous conditions which might overprint later pumping data. The data <br />acquired during this background test were variable, and may have reflected <br />aquifer responses to local pumping and/or recharge. <br />- 3.2 h r T <br />The constant -discharge test was conducted on February 16 and February 17, <br />---1988-to. "stress" -the aquifer and observe its hydraulic character at and near <br />the pumping well. This test was scheduled to last 24 hours (1440 minutes) <br />at a Qopont specified pumping rate of 35 gallons per minute (gpm). During <br />the initial stages of the test extreme drawdown occurred and the pumping <br />