My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 17 <br /> ■ Contaminated Soils Management— drums and bins used for the collection of contaminated <br /> soils shall be covered with sheeting or tarps when not in use. <br /> ■ Sanitary and Septic Wastes — portable toilets and hand wash stations are provided for <br /> employee use at the construction site. A local service will routinely clean and service the <br /> units, evacuating wastes generated. <br /> Sukut Construction's EPA Identification Number for all manifested wastes removed from the site <br /> is CAL 000 268 146. <br /> 500.4 Water Pollution Control Drawings <br /> The Water Pollution Control Drawings can be found in Attachment B of the SWPPP. <br /> 500.5 Construction BMP Maintenance, Inspection & Repair <br /> Inspections are critical in order to determine the effectiveness of BMP's used at the site and to <br /> identify failures that may result due to releases of sediment and/or non-storm water pollutants at <br /> the construction site. <br /> Daily inspections shall be made year round to ensure dust and track out is minimized at the site. <br /> Additionally, whenever rain is forecast to be 40% or greater the following special inspections shall <br /> be performed: <br /> ■ Prior to a forecast storm <br /> ■ After a rain event that causes water to collect within the construction site <br /> ■ At 24 hour intervals during extended rain events <br /> The Inspection Checklist provided in Attachment H, shall be used to document special inspections <br /> made surrounding storm events. Copies of the completed checklists shall be kept with the <br /> SWPPP. <br /> A program for maintenance, inspection and repair of BMP's is shown in Attachment G. <br /> 500.6 Post-Construction Storm Water Management <br /> 500.6.1 Post-Construction Control Practices <br /> Prior to completion of construction, inactive disturbed areas and interior dirt roads at the site will <br /> be seeded. The State of California will be responsible for all other work in the post-construction <br /> period. <br /> Prepared: April 12, 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.