My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Health Services (PHS), California Environmental Protection Agency (Cal-EPA) <br /> Department of Toxic Substances Control (DTSC), California Air Resources Board (GARB), <br /> and CIWMB (collectively: "the unified command") worked together to conduct emergency <br /> response activities (e.g., air monitoring, etc.)from the time the fire was discovered through <br /> August 10, 1998. Due to the site geography, the unified command decided to allow the fire <br /> to burn out by itself. County, state, and federal agencies continued to monitor the Site until <br /> the fire, which steadily diminished, was finally extinguished during December 2000. The <br /> CIWMB, in coordination with the Tracy Fire Department and PHS, supervised a <br /> subcontractor who extinguished the remaining patches of fire with foam and water. <br /> Work performed to assess environmental conditions at the Site is being managed by a <br /> partnership of regulatory agencies. The CIWMB serves as the lead enforcement agency <br /> (LEA) and manages the preparation of required documents and contractors involved with <br /> the site mitigation. DTSC is involved with supervising potential generation, characterization, <br /> and disposal of hazardous waste at the Site, as well as the review and approval of the <br /> required documents. The Regional Water Quality Control Board (RWQCB) is involved with <br /> the groundwater quality issues at the Site and approval of documents related to <br /> groundwater. <br /> 1 .3. Project Purpose <br /> The purpose of this document is to provide methods and procedures to be used to <br /> characterize soil in newly discovered solid waste disposal areas as illustrated in Figure 2 <br /> and to determine if the wastes contained therein should be considered a Resource <br /> Conservation and Recovery Act (RCRA) hazardous waste, a non-RCRA hazardous waste <br /> (i.e., California hazardous waste), and/or a designated waste. This document is also <br /> intended to cover other waste disposal areas that may be encountered in the future. <br /> 1 .4. Responsible Agency <br /> The CIWMB or its contractor is responsible for preparing and implementing this site <br /> sampling plan. <br /> 1 .5. Project Organization <br /> This project will be coordinated and managed by the CIWMB project manager, Mr. Todd <br /> Thalhamer. Mr. Thalhamer will direct the specific investigation activities performed by Sukut <br /> Construction Inc. (SCI) and LFR Levine-Fricke (LFR) personnel. On-site health and safety <br /> shall be the responsibility of the CIWMB or CIWMB contractor performing the sampling <br /> activities. As the lead contact on the project, Mr. Thalhamer may be reached at the <br /> California Integrated Waste Management Board, 1001 1 Street, P.O. Box 4025, Sacramento, <br /> California, 95812, or by calling (916) 341-6356. The CIWMB will use sampling equipment <br /> available in house and/or from a contractor. <br /> LFR will be responsible for implementing the site sampling plan and producing a sampling <br /> summary report. Soil samples collected pursuant to this plan will be analyzed by Severn <br /> Trent Laboratory (STL) of Sacramento, California (a state-certified laboratory). <br /> Sampling Plan for Small Waste Disposal Areas (final).doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.