Laserfiche WebLink
} <br /> sb <br /> ;) 6.4 Physical Hazard Sampling and Methodologies <br /> -., 6.4.1 Heat Stress <br /> Heat stress will be monitored at the site using the buddy system. The heat stress <br /> program shall follow recommendations for monitoring reQuirements and suggested <br /> work/rest schedules in the ACGIH TLVs for heat stress. Included in the program are <br /> general information, monitoring, prevention, and progression of heat stress. <br /> i 6.4.2 Noise <br /> According to noise standards in San JoaQuin County, acceptable noise levels in the <br />-> project area (as measured at the property line) may be up to 70 dBA, with levels not to <br /> } exceed an average of 50 dBA per hour. As par of mitigation measures incorporated into <br /> the project description, activities creating significant noise (as measured at the project <br /> area boundaries) shall be limited to the hours between 6:00 a.m. and 9:00 p.m. <br /> Monday through Saturday. Noise levels will be upheld in <br /> i <br /> 6.4.2.1 Occupational Noise Exposure <br /> All onsite personnel in the exclusion and contamination reduction <br /> zones shall wear hearing protection. The Project Superintendent <br /> will have a variety of ear protection to choose from. <br /> 6.4.2.2 Environmental Noise Exposure <br /> -' A- All outdoor construction activities shall conform to reQuirements <br /> set forth in the current CEQA Initial Study and RAP. <br /> 3 <br /> } <br /> i <br /> Sb Environmental Services,LLC O October,2003 California Integrated Waste Management Board <br />_- Site Specific Health and Safely Plan Page 43 of 62 Tracy Tire Fire Remediation Project <br />