My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> sb <br /> ;) 6.4 Physical Hazard Sampling and Methodologies <br /> -., 6.4.1 Heat Stress <br /> Heat stress will be monitored at the site using the buddy system. The heat stress <br /> program shall follow recommendations for monitoring reQuirements and suggested <br /> work/rest schedules in the ACGIH TLVs for heat stress. Included in the program are <br /> general information, monitoring, prevention, and progression of heat stress. <br /> i 6.4.2 Noise <br /> According to noise standards in San JoaQuin County, acceptable noise levels in the <br />-> project area (as measured at the property line) may be up to 70 dBA, with levels not to <br /> } exceed an average of 50 dBA per hour. As par of mitigation measures incorporated into <br /> the project description, activities creating significant noise (as measured at the project <br /> area boundaries) shall be limited to the hours between 6:00 a.m. and 9:00 p.m. <br /> Monday through Saturday. Noise levels will be upheld in <br /> i <br /> 6.4.2.1 Occupational Noise Exposure <br /> All onsite personnel in the exclusion and contamination reduction <br /> zones shall wear hearing protection. The Project Superintendent <br /> will have a variety of ear protection to choose from. <br /> 6.4.2.2 Environmental Noise Exposure <br /> -' A- All outdoor construction activities shall conform to reQuirements <br /> set forth in the current CEQA Initial Study and RAP. <br /> 3 <br /> } <br /> i <br /> Sb Environmental Services,LLC O October,2003 California Integrated Waste Management Board <br />_- Site Specific Health and Safely Plan Page 43 of 62 Tracy Tire Fire Remediation Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.