My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oscrept.bac _ Page 9 <br /> continuous on-site media interest throughout the day. News <br /> stories were reported by KSEE-24 , KMPH-26 and the Fresno Bee . <br /> May 26 , 1996 <br /> O/S Personnel : 1-FOSC, 2-START, 3-USCG, 7-CET, 20-CDF, <br /> Weather: same as 5/23/96 <br /> CET continued to extend the ramp across the canyon. <br /> Construction of the ramp was completed at 12 : 00 . CET commenced <br /> exploratory excavations to locate burning tires buried in the <br /> landfill . Numerous burning tires were located on the north slope <br /> of the landfill and were removed. The burning tires were placed <br /> on the ramp and CDF extinguished them with AFFF foam. By 19 : 00, <br /> most of the burning tires had been located and removed from the <br /> landfill . GARB and START continued on and off-site air monitoring <br /> and sample collection. <br /> May 27, 1996 <br /> O/S Personnel : 1-OSC, 2-START, 3-USCG, 7-CET, 15-CDF <br /> Weather: Temps 75-80 degrees, moderate winds from the <br /> north-northeast rotating west to northwest in the late afternoon <br /> CET completed removal of smoldering tires from the north <br /> slope of the landfill . The trackhoe operator commenced excavation <br /> of a deep trench across the canyon between the ramp and and the <br /> landfill . The trench was dug to the maximum depth for the <br /> excavator (approximately 20 feet) . During the trenching, numerous <br /> layers of compressed tires were exposed. No burning or smoldering <br /> tires were encountered. <br /> START continued air monitoring in and around the smoke plume <br /> and designed a soil sampling plan. The CDF 24-hour fire watch was <br /> replaced with a security guard service contracted by EPA. <br /> May 28 , 1996 <br /> FOSC Lewis relieved FOSC Shane. CET continued trenching and <br /> uncovered a hotspot where a segment of north slope of the <br /> landfill extended under the ramp. The smoldering tires were <br /> removed and extinguished. The trench was flooded with water and <br /> backfilled. The dozer operators commenced restoration work which <br /> involved backfilling excavated areas and recontouring around the <br /> landfill . An area located on the south slope of the ravine above <br /> the existing landfill was graded in preparation for the burial of <br /> hundreds of tires that had been removed during the excavation <br /> activities . CDF was released at 14 : 00 . <br /> CET prepared and submitted a plan for the construction of a <br /> downgradient underflow dam. START collected an initial set of <br /> soil samples from the burn area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.