My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012175
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
102
>
3500 - Local Oversight Program
>
PR0545890
>
ARCHIVED REPORTS_XR0012175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 12:17:07 PM
Creation date
7/22/2020 11:23:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012175
RECORD_ID
PR0545890
PE
3526
FACILITY_ID
FA0025958
FACILITY_NAME
ROEK BROTHERS CONSTRUCTION
STREET_NUMBER
102
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502065
CURRENT_STATUS
02
SITE_LOCATION
102 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3-5. COST ESTIMATE TO EXTRACT AND TREAT GROUND- <br /> WATER USING GROUNDWATER EXTRACTION WITH AIR STREPPING. <br /> Capital Costs <br /> Dual groundwater and vapor extraction $150,000 <br /> system with enhanced biodegradation using <br /> hydrogen peroxide infection <br /> Catalytic Oxidizer for air stripping plus <br /> $150,000 <br /> phase-separated hydrocarbon recovery <br /> equipment <br /> Site Work, System Installation and Start-uf $50,000 <br /> Capital costs for activated carbon $40,000 <br /> adsorption of stripper off-gas and discharge( <br /> groundwater <br /> Total Capital Costs $390,000 <br /> Qperating andin nan <br /> Ist Year- Dual Vapor and Groundwater $1{10,000 <br /> Extraction System, Oil/Water Separator, an( <br /> biodegradation system <br /> 2nd Year- Discharge Groundwater $40,000 <br /> Treatment with Activated Carbon Units <br /> 2nd Year- Discharge Groundwater <br /> Treatment with Activated Carbon Units $40,Q00 <br /> Performance Monitoring of Vapor $7,500 <br /> and Groundwater Treatment System Wells, <br /> and Groundwater Monitoring Wells <br /> Total Operations and Maintenance Costs $187,500 <br /> Total Estimated Capital and Operations $577,500 <br /> and Maintenance Costs <br /> Note All costs assume a flow rate of 10 gpm and 3 extraction wells <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.