Laserfiche WebLink
Kennedy/Jenks Consultants <br /> workers are In Level C protection, then work will cease and the source of the emission will <br /> be identified and controlled before work continues <br /> 6 4 Site Control <br /> The site is fenced around its perimeter Personnel and vehicle entry and exit will be <br /> restricted. There will be only one entry and one main exit Alternate exits will be used <br /> only in the event of an emergency These exits will be clearly marked <br /> Work zones will not be established for Level D activities Individuals not directly involved <br /> in ongoing work will be requested to stay at least 50 feet away from Level D activities <br /> 6 5 Decontamination <br /> For activities requiring Level D protection and modified Level C protection without <br /> established work zones, it is unlikely that major decontamination will be necessary. At the <br /> conclusion of each day, disposable gloves and coveralls will be removed and disposed of in <br /> onsite containers In addition, work boots will be removed and cleaned in a <br /> decontamination solution, or using a pressurized spray washer, prior to leaving the site, if <br /> boot covers have not been used <br /> If full Level C protection is required, minimum decontamination procedures associated with <br /> Level C protection will be followed and established within the decontamination Reduction <br /> Zone These procedures are presented in Table 4 <br /> 6.6 Training <br /> K/J personnel participating in field activities will have completed the Hazardous Waste <br /> Operations and Emergency Response 40-hour health and safety training course (29 CFR <br /> 1910 120) or have equivalent training Training requirements are discussed in K/J's <br /> Corporate Health and Safety Program Prior to each day of work, a meeting will be held at <br /> the site to familiarize personnel with health and safety issues, protective equipment, <br /> emergency Information and supplies, and to discuss special topics <br /> 6.7 Medical Monitoring <br /> K/J personnel participating in field activities will be included in a medical monitoring <br /> program The program Includes a baseline physical examination, pulmonary function test, <br /> and blood and urine tests Annual follow-up examinations are Included Details of the <br /> medical program are Included in K/J's Corporate Health and Safety Program <br /> 6 S Sanitation <br /> The site has no drinking water, washing water, or restroom facilities available. Drinking <br /> water and washing water is available at the Arco station next to the site Restroom <br /> facilities are available at nearby gas stations and fast food restaurants No eating, <br /> smoking, or gum chewing is allowed In restricted areas <br /> S1 mptM&SP1*n 8 910557 00 <br />