Laserfiche WebLink
t Of-Site Groundwater Investigation Work Plan Page 7 <br /> Rainwater Car Wash, Manteca, California 95336 <br /> May 30, 2012 <br /> Soil samples from the remaining soil borings will be collected at 5-foot intervals from ground surface to terminal <br /> depth and logged for lithologic analysis only.Drilling activities will be conducted to minimize cross- <br /> contamination of groundwater between water zones. Wooden plug and rubber gaskets will be fitted at the auger <br /> joints to minimize groundwater intrusion into the augers during drilling activities. <br /> ' Soil samples from hollow-stem drilling activities will be collected by driving a California-modified split-spoon <br /> sampler 18 inches into the undisturbed soil. The AA&A field geologist,under the supervision of the PG,will <br /> describe the soil in accordance with the Unified Soil Classification System.A portion of the soil sample collected <br /> will be screened for volatile organic compounds(VOCs)by headspace analysis,using a to photo-ionization <br /> ' detector(PID)calibrated to 100 parts per million(ppm)isobutylene.For each sampling interval,approximately <br /> 200 grams of soil will be placed in a plastic bag that will be sealed to allow organic vapors to volatize for several <br /> minutes prior to each measurement.After the soil and the atmosphere in the sealed plastic bag are allowed to <br /> equilibrate,the probe tip of the PID will be inserted into the plastic bag,and VOCs(in ppm)will be recorded. The <br /> boring number, sample depth, lithologic description, discolorations,and PID readings will be documented on the <br /> boring log. <br /> ' 5.3.3 Well Installation <br /> The dual-nested monitoring wells will be installed in accordance with the DWR Water Well Standards Bulletin <br /> ' 74-90. The wells will consist of a 0.02-inch,perforated PVC(Schedule 40)screen and Blank 2-inch-diameter <br /> PVC casing.The wells will be surged to allow the sand filter pack to settle. Additional filter pack material may be <br /> added as needed. A locking water-tight cap will be installed on the casing. The surface will be completed with a <br /> ' traffic-rated well box. The well construction diagram is illustrated on Figure 4. Well construction details for the <br /> groundwater wells are summarized in Table 1. Depths of the well casing may be adjusted in the field according to <br /> lithology. <br /> ' 5.3.4 Well Survey <br /> After the well installation,the well elevations will be surveyed by a California-licensed surveyor. The top of the <br /> ' well casings,cover of the wells,and the ground surface will be measured in feet relative to the North American <br /> Vertical Datum of 1988. The survey report will also include longitude and latitude coordinates for each well. The <br /> well elevation survey report will be included in the report. <br /> 5.3.5 Well Development and Groundwater Sampling <br /> ' In accordance with the SJCEHD's Well Standards a minimum of 12 hours will be allotted between the placement <br /> of the annular seal in each dual-nested groundwater monitoring well and well developments activities. The wells <br /> will be developed to remove suspended solids and/or other drilling fluids and materials using a rig-mounted surge <br /> block and bailer and a hand-bailer. Development will be accomplished by mechanically moving the rig bailer and <br /> surge block gently up and down the well casing to remove drilling fluids,suspended solids, settled solids, and <br /> other fine-grained materials that could inhibit well yield from the well screen. <br /> ' Approximately five well volumes of water will be purged from each well using a submersible water pump. The <br /> purged water will be monitored for turbidity,pH,specific conductance and temperature using instruments <br /> calibrated in advance in accordance with the manufacturer's instructions, and the data will be recorded in a field <br /> ' logbook. The purging will continue until approximately five well volumes of water have been removed or the <br /> water quality parameters have stabilized. <br /> Groundwater samples will be collected from each well following well development. Groundwater samples will be <br /> ' collected by a dedicated, disposable high-density polyethylene bailer.A bottom-emptying device will be attached, <br /> Ami Arora <br /> SAssocinCes.inc. <br />