My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2900 - Site Mitigation Program
>
PR0537485
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 3:42:55 PM
Creation date
7/27/2020 2:46:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537485
PE
2957
FACILITY_ID
FA0021568
FACILITY_NAME
FORMER RAINWATER CAR WASH
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21931206
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Off-Site Groundwater Investigation Work Plan page 8 <br /> Rainwater Car Wash,Manteca, California 95336 <br /> May 30, 2012 <br /> and two or three 40-milliliter volatile organic ampoules(VOAs)will be filled as required by the laboratory.The <br /> VOAs will be sealed with Teflon®-lined caps, labeled,placed on ice,and transported within 24 hours to Alpha <br /> ' Scientific Corporation of Cerritos,California.Each sample will be recorded on a chain-of-custody form <br /> identifying the sampler, sample name,type of sample containers, couriers, responsible laboratory personnel,and <br /> requested analyses.Copies of the chain-of-custody forms will be included in the laboratory report. <br /> ' 5.4 Equipment Decontamination <br /> The drilling augers and reusable sampling equipment will be decontaminated before and after drilling. <br /> ' Decontamination will be performed using the following procedure: <br /> • Washing in non-phosphate detergent and tap water wash; <br /> ' • Steam cleaning the augers; <br /> • Rinsing in clean tap water;and <br /> • Final rinse in deionized/distilled water. <br /> ' Disposable equipment intended for one-time use will not be decontaminated,but will be packaged for appropriate <br /> disposal. Cleaned small equipment will be stored in plastic bags. <br /> ' 5.5 Disposal of Investigation-Derived Wastes <br /> ' Soil cuttings and decontamination water generated during the drilling operations will be placed in Department of <br /> Transportation-approved 55-gallon drums,labeled,and stored at the site pending analytical result review and <br /> proper disposal. <br /> ' The drums will be identified with labels including the name of waste generator,type of waste(soil or water),and <br /> accumulation date. <br /> 5.6 Quality Assurance/Quality Control <br /> An integral part of sampling and analysis is QA/QC procedures to ensure the reliability and compatibility of all <br /> data generated during the investigation. The chemical data to be collected for this effort will be used to determine <br /> that the extent of contamination is properly evaluated. It is therefore critical that the chemical data be of the <br /> highest confidence and quality. Consequently,strict QA/QC procedures will be adhered to, including the <br /> following: <br /> ' • Observation of strict protocols for field sampling and decontamination procedures; and <br /> • Collection of one duplicate groundwater sample for selected laboratory methods at primary locations(at <br /> ' . least 10 percent). <br /> Laboratory calibration against internal standards,surrogate recoveries, laboratory control samples, instruments <br /> blanks,method blanks, and matrix spike/matrix spike duplicate samples to evaluate analytical precision and <br /> ' accuracy. <br /> 5.7 Field Variances <br /> ' As conditions in the field vary, it may become necessary to implement minor modifications to drilling locations as <br /> presented in this work plan,such as relocating borings due to unforeseen difficulties. These changes will be made <br /> at AA&A's discretion and without notification to the client. When appropriate,and in the event of major <br /> ' modifications, such as sudden interruption to the work requiring demobilization and additional costs,a property <br /> Ami Adini <br /> ' &Associates.dnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.