Laserfiche WebLink
' These samples will be collected prior to excavation to allow for completion of disposal profiling <br /> ' prior to mobilization. This will allow for better management of stockpiles and direct loading as <br /> feasible based on truck availability. <br /> 4.2.2 Excavation Confirmation Sampling <br /> Following removal of soil to the limits presented in Geocon's October 2015 Site Investigation <br /> Report, a XRF will be used' to screen for lead levels in the field. If the XRF indicates that lead <br /> ' concentrations are below cleanup goals, then confirmation soil samples will be collected as <br /> discussed below. <br /> ' Soil samples will be collected at discrete locations approximately every 25-linear feet along the <br /> length of the excavation sidewalls. The outside perimeter of the proposed excavation limits is <br /> approximately 614 feet; therefore, it is anticipated that a total of 25 sidewall samples will be <br /> ' collected for analysis. Sidewall samples will be collected at the surface to a depth of three inches 4. <br /> Discrete excavation floor confirmation soil samples will be collected for every 25 foot by 25 foot <br /> ' area (every 625 square feet). Based on the assumed excavation area of 16,604 W, a total of 27 <br /> bottom samples will be collected for analysis. Samples will be collected from areas of visual <br /> staining or other indications of impacts if observed. <br /> ' Confirmation samples (52 samples total) will be analyzed by Asset Laboratories' for total lead <br /> by EPA Method 6010B. A total of 25% of the confirmation samples (13 samples)will also be <br /> analyzed for CAM Metals by EPA Method 6010B/747IA and polynuclear aromatic <br /> hydrocarbons PAHs by EPA Method 8270C/SIM. <br /> The following table summarizes RSLs and laboratory Method Detection Limits (MDLs) and <br /> Practical Quantitation Limits (PQLs): <br /> Analyte RSL(mg/kg) MDL (mg/kg) PQL (mg/kg) <br /> tAntimony 31 0.213 2 <br /> ' Arsenic 126 0.103 1 <br /> Copper 3,100 0.107 2 <br /> Lead 80 0.116 1 <br /> Tin 47,000 0.0085 15 <br /> s Geocon has indicated that they will be performing the proposed XRF screening during field activities. <br /> 4 Sidewall samples are typically collected at the mid-point depth; however, surficial sampling is proposed <br /> as the majority of the observed contamination is surficial. <br /> 'Asset Laboratories is certified by the State of California's Department of Public Health Environmental <br /> Laboratory Accreditation Program (ELAP)and the National Environmental Laboratory Program(VELA) <br /> for the proposed metals with the exception of tin in soil for which there is not certification in California. <br /> ' e D[T�SSC-Schools Program screening value. <br /> +` yPACIFIC EDGE ENGINEERING 8 SREW_Manteca_draft.docx <br /> ' (949)470-1937;(949)470-0943(FAX) <br />