Laserfiche WebLink
CAC SECTION OBSERVATIONS RESULT <br /> 17670 Personnel 'Personnel are provided with particle C <br /> Health and masks and noise suppressors. The <br /> Safety. Local Enforcement Agency did not <br /> require any specific safety equipment <br /> and none was observed to be necessary. <br /> DISPOSAL SITE OPERATIONS. <br /> 17676 Confined The unloading area was well confined C <br /> Unloading. and organized, and safely served the <br /> number of vehicles using this site. <br /> (See slide 1.7) . <br /> 17677 Spreading and A thorough job of spreading and C <br /> Compacting. compacting was continued throughout <br /> the day. (See slide 1.7 and 1 .8) . <br /> 17678 Slopes and The slope of the working face was at C <br /> Cuts. a 3-5 degree angle (19. 2 - 9. 52:1 <br /> ratio) . This angle allowed the most <br /> effective compaction by the types of <br /> equipment used. (See Slide 1.7) . <br /> 17679 Final Site There were no final site faces at this N <br /> Face. facility the day of this inspection. <br /> John Giambastiani, the Site Supervisor <br /> informed me that the southern area <br /> will be finalized next year. <br /> 17680 Stockpiling. Cover was stockpiled to the west of C <br /> this years winter pad. The amount <br /> stockpiled was 1200 yd3 according to <br /> John Gianibastiani , the Site <br /> Supervisor. This should provide <br /> adequate cover material for the next <br /> four months. <br /> The location of this stockpile should <br /> not interfere with any site <br /> activities. <br /> Page No. 5 of 14 , Inspector: <br />