Laserfiche WebLink
141V <br /> i Installation Guide: Residential AdvanTee Systems <br /> Step 5g: Using the four stainless steel bolts provided,mount the <br /> bracket to the riser.The spacer posts go between the riser wall <br /> and the bracket.The bolt heads should be on the outside of the ' <br /> riser to seal the bolt holes in the riser.Tighten the bolts snugly so kY' <br /> that the bracket cannot be moved by hand. <br /> ro <br /> NOTE: Do not glue the split flow tee on the outside of the riser <br /> until you have determined the slope of the discharge line. <br /> Step 5h: The RSV comes with an 18" long stinger pipe,which <br /> is appropriate for most installations. Determine the correct stinger ' ' <br /> length for your installation and alter this pipe length accordingly. <br /> If the low liquid level is not specified for the particular installation, <br /> refer to Appendix 3 on page 20 for typical RSV and float settings. ; <br /> (The normal low liquid level—the level at which 100%of the <br /> filtrate returns to the tank—determines the stinger length.) <br /> For almost all applications,the stinger will be shorter than 2411, <br /> and the low liquid level will be approximately 6"below the top ' T <br /> of the RSV cage. We highly recommend keeping the stinger <br /> shorter than 36". Stingers longer than 36" require custom RSV 'x ' <br /> cages. (Contact your Dealer or Orenco for more information.) <br /> IMPORTANT- Correct stinger length is critical to the proper <br /> operation of the system! <br /> After you've cut the stinger pipe to the correct length, attach <br /> it to both the RSV cage and the RSV body using the stainless �++ C <br /> rt <br /> steel setscrews.You might have to back the setscrews out in SupQ�y ;n��� <br /> order to slide the stinger in.The setscrews allow you to rer-�e ��a1 1,914 n$� <br /> the stinger and adjust its len It is not necessary to glue t, prig;, ova��° WNW)g J �• � � ��r RSVZQ(D►model shown - <br /> pieces together. <br /> Step 5i: Determine the handle pipe length. Install the handle <br /> i in the to of the RSV body and secure with setscrews. <br /> pipe p Y pfd_ <br /> u <br /> Step 5j: For Mode 3 installations,the duckbill model RSV - <br /> is required,which has a flexible PVC tube that vents the RSV 3' <br /> cage to atmosphere.Push the flexible PVC tube onto the insert <br /> fitting on the cage.Thread the other end of the tube through the <br /> tube holder at the top of the RSV body. Leave about 6" of tube <br /> extending through the tube holder.Any excess can be cut off.No <br /> vent tube is required for Mode l installations. <br /> Step 5k: Carefully lower the RSV into the bracket attached to <br /> the inside of the access riser. Slide the RSV down until the two ` <br /> locating stops come in contact with the top edge of the bracket. <br /> NINt•AMAY-1 ®2004 Orence Systems'Inc. <br /> Rev 31.04104 <br />