My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
401
>
4200 – Liquid Waste Program
>
PR0526172
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2026 4:46:38 PM
Creation date
8/5/2020 10:00:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0526172
PE
4242 - WASTE WATER TX PLANT
FACILITY_ID
FA0017710
FACILITY_NAME
NATIONAL PSYCHIATRIC CARE & REHAB SVCS SJ
STREET_NUMBER
401
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
24130052
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\4200 - Liquid Waste\A\AIRPORT WAY\401\PR0526172\INSPECT CORRESPOND.PDF
Site Address
401 S AIRPORT WAY MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Gu'dO: �es �a���r� `� <br /> d anTex ' Systems <br /> 4 W2 <br /> Step 6a: Install the 2"PVC filtrate return line from the outlet <br /> coupling in the bottom of the AdvanTex pod to the inlet side of <br /> the split-flaw tee. This 2" filtrate return line should be sloped a <br /> minimum of 1/4"per foot..If the filtrate return line is less than 6' <br /> t <br /> long,provide a minimum of 1.5" total elevation difference from <br /> the outlet of the filter to the inlet of the split-flow tee. Be sure the <br /> INIR�mtu.1 2" filtrate return line is continuously sloped. <br /> NOTE. Do not allow any undulations or flat sections as this <br /> 4'- F <br /> will impair liquid and air movement. <br /> Step 6b: Be sure the split-flow tee is installed in the proper <br /> orientation. The filtrate return line connects to the end of the <br /> split-flow tee labeled"IN."The discharge pipe connects to the <br /> end of the split-flow tee labeled"OUT." <br /> Step 6c: When gluing the split-flow tee, orient it to <br /> accommodate the slope requirements of the discharge line. The <br /> discharge line should have a minimum slope of 1/4"per foot and <br /> a maximum slope of 2 inches per foot(10 degrees). If a slope of <br /> greater than 10 degrees is necessary, install the first 12 inches of <br /> the line at less than 10 degrees;then use fittings to achieve the <br /> necessary slope greater than 10 degrees. <br /> Step 6d: Plumb the discharge line from the split-flow tee, <br /> maintaining a 1/4"per foot slope. <br /> tA� <br /> a 2084 Orence Systemse Inc. KW&Ay1[A%-1 <br /> Rey&1.004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.