Laserfiche WebLink
Installation Guide: Residential AdvanTex® Systems <br /> Flow inducer Support pipes <br /> ������st�1�Biorl�r�e��"t�►n���ckage � � rF ��F � <br /> Step 7a: Detach the Schedule 80 support pipes from the ., <br /> packaging material,and remove one of the two screws from each <br /> pipe. Slide the support pipes through the holes in the support <br /> brackets at the top of the vault.Reinstall the screws. <br /> Step 7b: Gently lower the vault into position in the access riser. <br /> The support pipes should rest on top of the tank(unless the vault • . , ' <br /> was designed specifically to rest on the tank bottom). <br /> Step 7c: To install a splice box into an access riser,lubricate . - <br /> both the outside of the conduit coupling and the grommet with A <br /> pipe lubricant or an equivalent product and slide the coupling <br /> through the grommet until the box is snug against the riser wall. <br /> (Splice boxes can be mounted outside the access risers if they are <br /> specifically designed for external mounting.)Use conduit seal to <br /> ensure condensation does not affect the system. <br /> Step 7d: Carefully lower the pump and discharge assembly into <br /> the flow inducer of the Biotube pump vault. `= <br /> PUPORTANT Do not use the pump cable to lower the pump! <br /> Step 7e: Using pipe lubricant or an equivalent product,lubricate <br /> the access riser grommet and the gray nipple on the discharge <br /> assembly.Push the nipple through the grommet and orient the <br /> discharge assembly to make its removal for maintenance easy. <br /> In particular,make sure you can pull out the Biotube pump vault <br /> without having to disconnect anything. <br /> Step 7f: The float switch assembly mounts in the pump vault ' <br /> by clipping into the float bracket. Make sure you can detach it <br /> without removing the Biotube cartridge or pump vault. <br /> Step 7g: Although float switches are assembled at the factory <br /> for the appropriate depths, compare the float settings with the <br /> project plans and specifications.If you need to adjust a setting, <br /> refer to Appendix 3 on page 20 for typical RSV and float settings <br /> for residential systems. Grommet <br /> NOTE: Refer to ProSTEP Effluent Pump Packages Installation <br /> Guide (NIM-EPS-I)for more detailed pump package installation <br /> instructions. - <br /> Valve <br /> NIM-ATX-AX-1 ®2004 Oreneo Systems`Inc. <br /> Rev 11,04/04 <br />