Laserfiche WebLink
5) The wastewater treatment plant currently services forty-one (41) to forty-two (42) <br /> units on the average. The tanks are to be pumped of solids on a regular basis. The <br /> plant is monitored on a regular weekly basis by Tom McCoy, OMIT, of <br /> Quality Service, Inc. Operation and Maintenance reports shall be submitted to <br /> .the EHD on a quarterly basis or according to the contractual frequency of services <br /> provided by Quality Service, Inc. <br /> 6) The effluent is received at a main 1,500 gallon tank and is passed through a <br /> series of tanks with a 10,000 gallon capacity with diffusers and aerators to the main <br /> distribution box. The effluent is then distributed into seepage pits located north and <br /> east of the plant. New seepage pits have been installed under EHD permit <br /> SR # 0057183. Effluent at the main distribution box appeared brownish in color and <br /> within an acceptable color range. <br /> 7) The plant is currently being evaluated by personnel of Quality Service to determine the <br /> functionality of the WWTP sewage disposal fields and to determine if additional repairs <br /> are warranted. The WWTP and its components are maintained and operated on a <br /> routine contractual basis by Mr. Tom McCoy, OMIT, of Quality Service, Inc. Continue to <br /> maintain and operate the plant efficiently. A copy of this report will be sent to La <br /> Cumbre Management Company and Tom McCoy, OMIT. <br /> For the permitting year 2012-2013, analytical testing and reporting to the EHD is <br /> required as part of a condition of the operating permit. The wastewater shall be <br /> required to be sampled for the following constituents by an employee of a state <br /> certified analytical laboratory and results submitted to the EHD: <br /> TKN- Includes Nitrates and Ammonia <br /> BOD - Biological Oxygen Demand <br /> TSS- Total Suspended Solids <br /> pH <br /> CBOD - Carbonaceous Biological Oxygen Demand <br /> A wastewater treatment plant operator, or certified operator certified by the State of <br /> California Water Resources Control Board, shall be available to operate the plant. The <br /> EHD currently lists Mr. Tom McCoy on file as the certified operator. A copy of a current <br /> certification shall be submitted to the EHD and maintained in the permanent file. A <br /> copy of the certificate is not on file. Submit a copy to the EHD upon receipt of this <br /> inspection report. <br /> The EHD currently lists Segal Family Trust DTD as the legal responsible party. Should <br /> there be any changes in the status of this facility, notify the EHD. <br /> If you should have any questions, please call me at (209) 468-3455. Lisa Medina, <br /> Senior REHS <br /> Lisa Medina, Senior REH" �' <br /> C: La Cumbre Management Company C: Tom McCoy <br /> Country Manor Mobile Home Park Quality Service <br /> 100 N Hope Avenue Suite#1 27348 E Hwy 120 <br /> Santa Barbara, CA 93110 Escalon, CA 95320 <br /> 2 <br />