Laserfiche WebLink
Water Quality Control Boards. <br /> SAFETY PLAN <br /> Field work will be performed at the site in accordance with a site safety plan <br /> developed specifically for the site conditions Personnel working on-site will be briefed on <br /> the contents of the safety plan. A copy of the Site Safety Plan will be kept at the work site <br /> and will be available for reference by appropriate parties during the work. <br /> SOIL BORING/SAMPLING <br /> The soil borings will be drilled using 8-10 inch diameter, continuous flight, hollow <br /> steam auger and a Mobile B-61, or similar, drill ng. Auger flights will be steam cleaned <br /> prior to use to minimize the possibility of cross-contarmnation Drilling will be performed <br /> under the guidance of a field geologist and the earth materials m the borings will be logged <br /> as drilled. During drilling, soil samples will be collected continuously within the first soil <br /> boring drilled and every five(S) feet in the remaining two soil bonngs drilled Soil samples <br /> will be retrieved using a California-modified split-spoon sampler equipped with laboratory <br /> cleaned brass sleeves and a five foot barrel sampler. Continuous sampling will assist the <br /> geologist m evaluating the subsurface geology and provide technical guidance for monitoring <br /> well screen placement. Samples will be collected by advancing the boring to a point jusi <br /> i` above the sampling depth, then driving the sampler into the native soil through the hollow <br /> i l I I <br /> { S <br /> I' l <br /> li <br />