Laserfiche WebLink
the facility with a load exceeding 80,000 lbs GVW. Bottom ash trucks are completely <br /> covered by tarpaulin prior to leaving the Site. <br /> 7.3 RECEIVER FACILITY APPROVAL PROCESS <br /> Facilities interested in receiving Ash from the Facility are required to be approved by the <br /> Plant Manager and Corporate Environmental Lead prior to transporting Ash to such <br /> facility. The Plant Manager employs the following procedures to ensure the proper <br /> transportation, handling and application of the Ash at the prospective receiving facilities. <br /> An application for the beneficial reuse of Fly Ash or Bottom Ash form is provided to the <br /> prospective receiving facility. The form is completed by the receiving facility's authorized <br /> person (site owner or operator) and returned to DTES. A copy of the application form is <br /> attached to this AMP as Appendix C. <br /> DTES reviews the completed application and schedules a visit to the receiving facility to <br /> verify the contents of the application, observe facility operations, interview staff, observe <br /> locations of Ash reuse, and to review any additional onsite documents. <br /> The initial site visit is performed by Plant Manager, By-Products Manager or EH&S <br /> Coordinator, and a qualified environmental consultant retained by DTES. After the visit <br /> to the receiving facility, the environmental consultant prepares an Environmental <br /> Compliance Review Report documenting the compliance status of the receiving site with <br /> applicable Federal, State and local regulations. <br /> After the completion of the Environmental Compliance Review Report, the Corporate <br /> Environmental Lead determines if the receiving facility is in compliance with applicable <br /> Federal, State and local regulations, and all relevant approvals are in place and the <br /> receiving facility is eligible to accept the Ash. If the facility is deemed acceptable to <br /> receive Ash, the Corporate Environmental Lead will recommend to the DTES Plant <br /> Manager to move forward with contracting with the receiver facility. DTES then enters <br /> into an agreement with the receiving facility and begins routine deliveries of Ash to the <br /> receiving facility. <br /> 7.4 ANNUAL REVIEWS <br /> Once a receiving facility has been deemed acceptable, DTES' qualified environmental <br /> consultant, Plant Manager, By-Products Manager or EH&S coordinator conducts an <br /> annual visit to each receiving facility that receives Ash in a given year. The purpose of <br /> the annual reviews is to evaluate whether the receiving facilities are using the Ash as <br /> intended in the beneficial use application. The reviews focus on any areas that have <br /> changed since the previous visit and the locations where the Ash is being reused. <br /> 18 <br />