My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2200 - Hazardous Waste Program
>
PR0514248
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 4:29:23 PM
Creation date
8/18/2020 11:10:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0514248
PE
2294
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOCATION PROCEDURE NUMBER <br /> DTE STOCKTON, LLC EAP-01 <br /> DTEStockton, LLC EMERGENCY ACTION PLAN REV: 10, updated: 3/2018 <br /> STATUS: FINAL Page 14 of 35 <br /> 9.2 Delayed Site Evacuation Procedure: <br /> 1. Personnel present in the Plant Control Room shall immediately perform the <br /> following actions: <br /> (a) Take necessary operating actions to place the plant in the most stable <br /> condition,based upon the type of emergency. <br /> (b) Locate and obtain the employee &visitor/contractor sign-in sheet ((in <br /> the Administration Building Lobby). <br /> (c) Communicate names of visitors/contractors currently in the operating <br /> areas to outside operating personnel. Instruct outside operating <br /> personnel to locate and direct all visitors/contractors to proceed to the <br /> control room for egress instructions. <br /> (d) When all visitors, contractors and non-essential operating personnel <br /> have been accounted for and are present in the control room, the Plant <br /> Manager shall designate a trained person to escort all non-essential <br /> personnel to the north assembly area along the safest egress route. <br /> (e) Notify the Operations Manager and Control Room Operator of the <br /> current plant status, and evacuation details. <br /> (f) Perform a controlled plant shutdown in accordance with appropriate <br /> plant procedures and directions from the Plant Manager. <br /> (g) Once the plant shutdown has been completed, all essential personnel <br /> shall gather in the control room and take roll call. When all essential <br /> operating personnel are present and accounted for, evacuation to the <br /> south assembly area shall be performed, unless the egress route to the <br /> south assembly area is not safe for travel. In such case, proceed to the <br /> north assembly area. <br /> 2. Personnel present in the plant operating areas (other than control room) shall <br /> immediately perform the following actions: <br /> (a) Continuously monitor the plant radio system for information and <br /> instructions. <br /> (b) Perform immediate response actions, as appropriate, to place the plant <br /> in the most stable condition,based upon the type of emergency. <br /> (c) Locate and direct non-essential personnel to proceed to the control <br /> room immediately. <br /> (d) Perform plant shutdown instructions as directed by the Operations <br /> Manager. <br /> Emergency Action Plan—DTE Stockton, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.